Development of Low Voltage Network Templates—Part II: Peak Load Estimation by Clusterwise Regression

This paper proposes a novel contribution factor (CF) approach to predict diversified daily peak load of low voltage (LV) substations. The CF for each LV template developed in part I of the paper is determined by a novel method-clusterwise weighted constrained regression (CWCR). It takes into account the contribution from different customer classes to substation peaks, respecting the natural difference in time and magnitude between LV substation peaks and the variance within the templates. In CWCR, intercept and coefficients are constrained to ensure that the resultant coefficients do not lead to reverse load flow and can respect zero-load substations. Cross validation is developed to validate the stability of the proposed method and prevent over fitting. The proposed method shows significant improvement in the accuracy of peak estimation over the current status quo across 800 substations of different mixes of domestic, industrial and commercial (I&C) customers. The work in the two parts of the paper is particularly useful for understanding the capabilities of LV networks to accommodate the increasing penetration of low carbon technologies without large-scale monitoring.

[1]  J. Nazarko,et al.  Estimating Substation Peaks from Load Research Data , 1997, IEEE Power Engineering Review.

[2]  Joanicjusz Nazarko,et al.  Estimation of diversity and kWHR-to-peak-kW factors from load research data , 1994 .

[3]  Bin Zhang Regression clustering , 2003, Third IEEE International Conference on Data Mining.

[4]  Joanicjusz Nazarko,et al.  The fuzzy regression approach to peak load estimation in power distribution systems , 1999 .

[5]  K. Steemers,et al.  A method of formulating energy load profile for domestic buildings in the UK , 2005 .

[6]  Zechun Hu,et al.  Quantification of low voltage network reinforcement costs: A statistical approach , 2013, IEEE Transactions on Power Systems.

[7]  Charles L. Lawson,et al.  Solving least squares problems , 1976, Classics in applied mathematics.

[8]  J. W. Taylor,et al.  Short-Term Load Forecasting With Exponentially Weighted Methods , 2012, IEEE Transactions on Power Systems.

[9]  Manuel A. Matos,et al.  Assessing Error Bars in Distribution Load Curve Estimation , 1997, ICANN.

[10]  José Antonio Lozano,et al.  Sensitivity Analysis of k-Fold Cross Validation in Prediction Error Estimation , 2010, IEEE Transactions on Pattern Analysis and Machine Intelligence.

[11]  T. Hesterberg,et al.  A regression-based approach to short-term system load forecasting , 1989, Conference Papers Power Industry Computer Application Conference.

[12]  Joanicjusz Nazarko,et al.  Identification of statistical properties of diversity and conversion factors from load research data , 1998, MELECON '98. 9th Mediterranean Electrotechnical Conference. Proceedings (Cat. No.98CH36056).

[13]  Nima Amjady,et al.  Short-term hourly load forecasting using time-series modeling with peak load estimation capability , 2001 .

[14]  Y. Y. Hong,et al.  Development of Energy Loss Formula for Distribution Systems Using FCN Algorithm and Cluster-Wise Fuzzy Regression , 2002, IEEE Power Engineering Review.

[15]  V. Miranda,et al.  Fuzzy inference systems applied to LV substation load estimation , 2005, IEEE Transactions on Power Systems.

[16]  C. Lawson,et al.  Solving least squares problems , 1976, Classics in applied mathematics.