Aggregate Capacitated Lot-Size Scheduling for a Class of Flexible Machining and Assembly Systems
暂无分享,去创建一个
[1] D. Collier. Aggregate Safety Stock Levels and Component Part Commonality , 1982 .
[2] Godwin C. Ovuworie,et al. Mathematical Programming: Structures and Algorithms , 1979 .
[3] E. Toczylowski,et al. Multi-level production scheduling for a class of flexible machining and assembly systems , 1989 .
[4] W. Zangwill. A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System---A Network Approach , 1969 .
[5] E. Newson. Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources , 1975 .
[6] E. Newson. Multi-Item Lot Size Scheduling by Heuristic Part II: With Variable Resources , 1975 .
[7] Khalil S. Hindi,et al. Unit commitment of thermal generation , 1980 .
[8] U. Karmarkar,et al. Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems , 1984 .
[9] A. Brameller,et al. Solution of fixed cost trans-shipment problems by a branch and bound method , 1978 .
[10] J. E. Kelley,et al. The Cutting-Plane Method for Solving Convex Programs , 1960 .
[11] E. Toczylowski. Aggregation of Resource Constraints for Groups of Similar Components in Manufacturing Systems , 1988 .
[12] Eugeniusz Toczyłowski. On aggregation of items in the single-stage lot size scheduling problem , 1986 .