Investment Control of Construction Project
暂无分享,去创建一个
The measures for effective investment control of construction project include: raise the scientific nature of feasibility study report, compile practical and feasible design task book, strengthen design bidding and quota design, optimize design scheme, compile scientific bidding documents, properly sign construction contracts, strictly control design changes, strengthen investment management of equipment and material, make good analysis on investment and budget, strictly control payment progress and quality, correctly prevent and treat claims, and carefully examine and verify quantities and costs.