A New Approach to Power System Planning
暂无分享,去创建一个
[1] M. Munasinghe. The leisure cost of electric power failures , 1978 .
[2] J. Warford,et al. Shadow pricing and power tariff policy , 1978 .
[3] S. Dhar,et al. Power System Long-Range Decision Analysis Under Fuzzy Environment , 1979, IEEE Transactions on Power Apparatus and Systems.
[4] C. W. Watchorn. Power and Energy Production [includes discussion] , 1954, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[5] P. Kleindorfer,et al. Reliability and public utility pricing , 1978 .
[6] M. Telson,et al. The Economies of Alternative Levels of Reliability for Electric Power Generation Systems , 1975 .
[7] R. Sherman,et al. Second Best Pricing with Stochastic Demand , 1978 .
[8] C. W. Watchorn. A Review of Some Basic Characteristics of Probability Methods as Related to Power System Problems , 1964 .
[9] M. Munasinghe,et al. Economic criteria for optimizing power system reliability levels , 1979 .
[10] A. D. Patton,et al. Power Reliability Cost vs Worth , 1972 .
[11] M. Webb,et al. The determination of reserve generating capacity criteria in electricity supply systems , 1977 .