Real-time production control of an FMS in a produce-to-order environment
暂无分享,去创建一个
[1] Kathryn E. Stecke,et al. Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems , 1983 .
[2] Min-Hong Han,et al. Flow control in flexible manufacturing: minimization of stockout cost , 1989 .
[3] Uttarayan Bagchi,et al. Experimental investigation of real-time scheduling in flexible manufacturing systems , 1985 .
[4] Ram Rachamadugu,et al. Due date based scheduling in a general flexible manufacturing system , 1989 .
[5] Jim Hutchison,et al. Scheduling approaches for random job shop flexible manufacturing systems , 1991 .
[6] David R. Denzler,et al. Experimental investigation of flexible manufacturing system scheduling decision rules , 1987 .
[7] David D. Yao,et al. Flexible Parts Routing in Manufacturing Systems , 1990 .
[8] Ludo Gelders,et al. Allocating work between an FMS and a conventional jobshop: A case study , 1988 .
[9] Michael J. Shaw. A pattern-directed approach to FMS scheduling , 1988 .
[10] Moshe M. Barash,et al. Operational control of item flow in versatile manufacturing systems , 1979 .
[11] L. N. Van Wassenhove,et al. Analysis of Scheduling Rules for an FMS , 1990 .
[12] Oded Maimon,et al. Dynamic Scheduling and Routing for Flexible Manufacturing Systems that Have Unreliable Machines , 1988, Oper. Res..
[13] Kripa Shanker,et al. A loading and dispatching problem in a random flexible manufacturing system , 1985 .
[14] Richard Hildebrant. Scheduling flexible machining systems using mean value analysis , 1980, 1980 19th IEEE Conference on Decision and Control including the Symposium on Adaptive Processes.
[15] Kathryn E. Stecke,et al. Loading and control policies for a flexible manufacturing system , 1981 .
[16] Joong-In Kim,et al. Multi-criteria operational control rules in flexible manufacturing systems (FMSs) , 1990 .
[17] W. M. Nawijn,et al. Quasi on-line scheduling Procedures for Flexible Manufacturing Systems , 1988 .
[18] Albert Jones,et al. A real-time production scheduler for a stochastic manufacturing environment , 1988 .
[19] Stanley B. Gershwin,et al. An algorithm for the computer control of a flexible manufacturing system , 1983 .
[20] Marco Garetti,et al. On-line loading and dispatching in flexible manufacturing systems , 1990 .