An Efficient Heuristic Algorithm for Overhead Cranes Scheduling Operations in workshop

This paper discusses the scheduling problem for two factory cranes that move along a single track, which is one of the most important equipment in manufacturing shop. Each crane is assigned a sequence of pickups and deliveries at specified locations and the two cranes must be operated so as to avoid interference with each other. In order to minimize the makespan, we define the bottleneck crane, which takes the maximum time to complete a given set of tasks. And a mixed-integer programming model which considers various constraints related to the operations of cranes is formulated. However, this problem is NP-hard, therefore we propose a heuristic algorithm to solve this problem. Finally, a numerical experiment on a specific manufacturing plant is used to illustrate the efficiency from computational point of view.

[1]  Der-Horng Lee,et al.  Heuristics for quay crane scheduling at indented berth , 2011 .

[2]  Lele Zhang,et al.  On-line scheduling with non-crossing constraints , 2008, Oper. Res. Lett..

[3]  I. B. Turksen,et al.  Crane Scheduling Problems , 1981 .

[4]  I. B. Turksen,et al.  Two-Operation Crane Scheduling Problems , 1982 .

[5]  Ling Li,et al.  A solution for cyclic scheduling of multi-hoists without overlapping , 2009, Ann. Oper. Res..

[6]  Hirofumi Matsuo,et al.  Crane scheduling problem in a computer-integrated manufacturing environment , 1991 .

[7]  Lixin Tang,et al.  Scheduling of a single crane in batch annealing process , 2009, Comput. Oper. Res..

[8]  Chung-Lun Li,et al.  A multiprocessor task scheduling model for berth allocation: heuristic and worst-case analysis , 2002, Oper. Res. Lett..

[9]  Weijian Mi,et al.  A hybrid parallel genetic algorithm for yard crane scheduling , 2010 .

[10]  Hirofumi Matsuo,et al.  A knowledge-based system for stacker crane control in a manufacturing environment , 1989, IEEE Trans. Syst. Man Cybern..

[11]  Reza Tavakkoli-Moghaddam,et al.  An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports , 2009, Comput. Ind. Eng..

[12]  Zhiqiang Lu,et al.  A heuristic for the quay crane scheduling problem based on contiguous bay crane operations , 2012, Comput. Oper. Res..

[13]  Kap Hwan Kim,et al.  A crane scheduling method for port container terminals , 2004, Eur. J. Oper. Res..

[14]  Christian Bierwirth,et al.  A survey of berth allocation and quay crane scheduling problems in container terminals , 2010, Eur. J. Oper. Res..

[15]  Sai Ho Chung,et al.  A modified genetic algorithm for quay crane scheduling operations , 2012, Expert Syst. Appl..

[16]  Ling Li,et al.  Optimal cyclic single crane scheduling for two parallel train oilcan repairing lines , 2012, Comput. Oper. Res..

[17]  Iiro Harjunkoski,et al.  Optimal Movement of Factory Cranes , 2008 .

[18]  Gao Xiao-qiang Simulation model of crane scheduling in workshop based on cellular automata , 2008 .