Investigating the Use of Set-Based Concurrent Engineering in Product Manufacturing Companies
暂无分享,去创建一个
Torgeir Welo | Geir Ringen | Atle Lycke | T. Welo | G. Ringen | Atle Lycke
[1] Durward K. Sobek,et al. Toyota's Principles of Set-Based Concurrent Engineering , 1999 .
[2] Durward K. Sobek,et al. The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster , 1995 .
[3] Pär Åhlström,et al. The difficult path to lean product development , 1996 .
[4] Torgeir Welo,et al. Beyond Waste Elimination: Assessing Lean Practices in Product Development , 2016 .
[5] Mikel Sorli,et al. The transformation of product development process into lean environment using set-based concurrent engineering: A case study from an aerospace industry , 2013, Concurr. Eng. Res. Appl..
[6] David J. Singer,et al. What Is Set-Based Design? , 2009 .
[7] D. Deitz. A set-based model of design , 1996 .
[8] Dag Raudberget,et al. Practical Applications of Set-Based Concurrent Engineering in Industry , 2010 .
[9] Torgeir Welo,et al. On the application of lean principles in Product Development: a commentary on models and practices , 2011 .