Operations Sequencing for a Multi-Stage Production Inventory System
暂无分享,去创建一个
[1] Ram Akella,et al. Supply management in assembly systems with random yield and random demand , 2000 .
[2] Anand Paul,et al. A Generalized Model of Operations Reversal for Fashion Goods , 2001, Manag. Sci..
[3] S. Axsäter,et al. Installation vs. echelon stock policies for multilevel inventory control , 1993 .
[4] Hau L. Lee,et al. Input Control for Serial Production Lines Consisting of Processing and Assembly Operations with Random Yields , 1996, Oper. Res..
[5] Hylton Boothroyd. Least-cost Testing Sequence , 1960 .
[6] Ignacio E. Grossmann,et al. Optimization Models for the Scheduling of Testing Tasks in New Product Development , 1996 .
[7] Fangruo Chen,et al. Lower Bounds for Multi-Echelon Stochastic Inventory Systems , 1994 .
[8] Jonathan F. Bard,et al. Note-Operations Sequencing in Discrete Parts Manufacturing , 1989 .
[9] Hau L. Lee,et al. Lot Sizing with Random Yields: A Review , 1995, Oper. Res..
[10] Yigal Gerchak,et al. A single-period production model with uncertain output and demand , 1986, 1986 25th IEEE Conference on Decision and Control.
[11] David Simchi-Levi,et al. Performance Evaluation of Stochastic Multi-Echelon Inventory Systems: A Survey , 2012, Adv. Oper. Res..
[12] Yigal Gerchak,et al. Multiple Lotsizing in Production to Order with Random Yields: Review of Recent Advances , 2004, Ann. Oper. Res..
[13] Hau L. Lee,et al. Production Control in Multistage Systems with Variable Yield Losses , 1988, Oper. Res..
[14] T.C.E. Cheng,et al. The complexity of single machine scheduling with two distinct deadlines and identical decreasing rates of processing times , 1998 .
[15] Tal Ben-Zvi,et al. Lot-Sizing Two-Echelon Assembly Systems with Random Yields and Rigid Demand , 2006, Eur. J. Oper. Res..
[16] Anne Spence Wein,et al. Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment , 1992, Oper. Res..
[17] Christopher S. Tang,et al. Variability Reduction Through Operations Reversal , 1998 .
[18] Roman Kapuscinski,et al. Variance vs. Standard Deviation: Variability Reduction Through Operations Reversal , 1999 .
[19] ERIKA SCHRANER,et al. Optimal production operations sequencing , 1997 .
[20] Wen-Chiung Lee,et al. Single-machine group scheduling problems with deterioration consideration , 2008, Comput. Oper. Res..
[21] Wen-Chiung Lee,et al. A Note on Deteriorating Jobs and Learning in Single-Machine Scheduling Problems , 2004 .
[22] T. C. Edwin Cheng,et al. The Complexity of Scheduling Starting Time Dependent Tasks with Release Times , 1998, Inf. Process. Lett..
[23] Chelliah Sriskandarajah,et al. Supply-chain redesign to reduce safety stock levels: sequencing and merging operations , 2002, IEEE Trans. Engineering Management.
[24] Sid Browne,et al. Scheduling Deteriorating Jobs on a Single Processor , 1990, Oper. Res..
[25] Yunzeng Wang,et al. Periodic review production models with variable capacity, random yield, and uncertain demand , 1996 .
[26] Saurabh Gupta,et al. Product family-based assembly sequence design methodology , 1998 .
[27] T. C. Edwin Cheng,et al. Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan , 2007, Eur. J. Oper. Res..
[28] Dar-Li Yang,et al. Some scheduling problems with deteriorating jobs and learning effects , 2010, Comput. Ind. Eng..
[29] Yigal Gerchak,et al. The Structure of Periodic Review Policies in the Presence of Random Yield , 1990, Oper. Res..