Operations Sequencing for a Multi-Stage Production Inventory System

This paper studies operations sequencing for a multi-stage production inventory system with lead times under predictable (deterministic) yield losses and random demand. We consider various cases with either full or partial release of work-in-process (WIP) inventories, for either pre- or post-operation cost structures, and under either the total discounted or average cost criteria. We derive necessary and sufficient criteria for the optimal sequence of operations in all cases. While the criteria differ in their specific forms, they all lead to the same principal: those operations with (1) lower yields, (2) lower processing costs, (3) longer lead times, and (4) lower inventory holding costs should be placed higher upstream in the system.

[1]  Ram Akella,et al.  Supply management in assembly systems with random yield and random demand , 2000 .

[2]  Anand Paul,et al.  A Generalized Model of Operations Reversal for Fashion Goods , 2001, Manag. Sci..

[3]  S. Axsäter,et al.  Installation vs. echelon stock policies for multilevel inventory control , 1993 .

[4]  Hau L. Lee,et al.  Input Control for Serial Production Lines Consisting of Processing and Assembly Operations with Random Yields , 1996, Oper. Res..

[5]  Hylton Boothroyd Least-cost Testing Sequence , 1960 .

[6]  Ignacio E. Grossmann,et al.  Optimization Models for the Scheduling of Testing Tasks in New Product Development , 1996 .

[7]  Fangruo Chen,et al.  Lower Bounds for Multi-Echelon Stochastic Inventory Systems , 1994 .

[8]  Jonathan F. Bard,et al.  Note-Operations Sequencing in Discrete Parts Manufacturing , 1989 .

[9]  Hau L. Lee,et al.  Lot Sizing with Random Yields: A Review , 1995, Oper. Res..

[10]  Yigal Gerchak,et al.  A single-period production model with uncertain output and demand , 1986, 1986 25th IEEE Conference on Decision and Control.

[11]  David Simchi-Levi,et al.  Performance Evaluation of Stochastic Multi-Echelon Inventory Systems: A Survey , 2012, Adv. Oper. Res..

[12]  Yigal Gerchak,et al.  Multiple Lotsizing in Production to Order with Random Yields: Review of Recent Advances , 2004, Ann. Oper. Res..

[13]  Hau L. Lee,et al.  Production Control in Multistage Systems with Variable Yield Losses , 1988, Oper. Res..

[14]  T.C.E. Cheng,et al.  The complexity of single machine scheduling with two distinct deadlines and identical decreasing rates of processing times , 1998 .

[15]  Tal Ben-Zvi,et al.  Lot-Sizing Two-Echelon Assembly Systems with Random Yields and Rigid Demand , 2006, Eur. J. Oper. Res..

[16]  Anne Spence Wein,et al.  Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment , 1992, Oper. Res..

[17]  Christopher S. Tang,et al.  Variability Reduction Through Operations Reversal , 1998 .

[18]  Roman Kapuscinski,et al.  Variance vs. Standard Deviation: Variability Reduction Through Operations Reversal , 1999 .

[19]  ERIKA SCHRANER,et al.  Optimal production operations sequencing , 1997 .

[20]  Wen-Chiung Lee,et al.  Single-machine group scheduling problems with deterioration consideration , 2008, Comput. Oper. Res..

[21]  Wen-Chiung Lee,et al.  A Note on Deteriorating Jobs and Learning in Single-Machine Scheduling Problems , 2004 .

[22]  T. C. Edwin Cheng,et al.  The Complexity of Scheduling Starting Time Dependent Tasks with Release Times , 1998, Inf. Process. Lett..

[23]  Chelliah Sriskandarajah,et al.  Supply-chain redesign to reduce safety stock levels: sequencing and merging operations , 2002, IEEE Trans. Engineering Management.

[24]  Sid Browne,et al.  Scheduling Deteriorating Jobs on a Single Processor , 1990, Oper. Res..

[25]  Yunzeng Wang,et al.  Periodic review production models with variable capacity, random yield, and uncertain demand , 1996 .

[26]  Saurabh Gupta,et al.  Product family-based assembly sequence design methodology , 1998 .

[27]  T. C. Edwin Cheng,et al.  Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan , 2007, Eur. J. Oper. Res..

[28]  Dar-Li Yang,et al.  Some scheduling problems with deteriorating jobs and learning effects , 2010, Comput. Ind. Eng..

[29]  Yigal Gerchak,et al.  The Structure of Periodic Review Policies in the Presence of Random Yield , 1990, Oper. Res..