Event-Based Approach to Optimize the Timing of Water Main Rehabilitation with Asset Management Strategies
暂无分享,去创建一个
[1] Barry J. Adams,et al. LONG-TERM PLANNING METHODOLOGY FOR WATER DISTRIBUTION SYSTEM REHABILITATION , 1998 .
[2] Stefano Alvisi,et al. Near-optimal rehabilitation scheduling of water distribution systems based on a multi-objective genetic algorithm , 2006 .
[3] Larry W. Mays,et al. OPTIMAL MAINTENANCE SCHEDULING FOR WATER DISTRIBUTION SYSTEMS , 1992 .
[4] Paul Davis,et al. Asset planning for water reticulation systems - the PARMS model , 2003 .
[5] Larry W. Mays,et al. Optimal Rehabilitation Model for Water‐Distribution Systems , 1993 .
[6] James H. Lambert,et al. Capacity Reliability of Water Distribution Networks and Optimum Rehabilitation Decision Making , 1996 .
[7] Larry W. Mays,et al. Optimization Model for Water Distribution System Design , 1989 .
[8] Magnus Moglia,et al. Decision support system for water pipeline renewal prioritisation , 2006, J. Inf. Technol. Constr..
[9] D. Kelly O'Day,et al. Organizing and analyzing leak and break data for making main replacement decisions , 1982 .
[10] Balvant Rajani,et al. Using limited data to assess future needs , 1999 .
[11] J. Villeneuve,et al. Optimal replacement of water pipes , 2003 .
[12] John H. Holland,et al. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .
[13] Stephanie P. MacLeod,et al. Evaluating the Impact of Climate Change Mitigation Strategies on the Optimal Design and Expansion of the Amherstview, Ontario, Water Network: Canadian Case Study , 2012 .
[14] Juan Vercher,et al. Developing an Integrated Model for Water Distribution Systems Considering Both Distributed Leakage and Pressure-Dependent Demands , 1999 .
[15] Graeme C. Dandy,et al. Optimal Scheduling of Water Pipe Replacement Using Genetic Algorithms , 2001 .
[16] G P Arulraj,et al. CONCEPT OF SIGNIFICANCE INDEX FOR MAINTENANCE AND DESIGN OF PIPE NETWORKS. TECHNICAL NOTE , 1995 .
[17] Graeme C. Dandy,et al. Multi-Objective Trade-Offs between Cost and Reliability in the Replacement of Water Mains , 2006 .
[18] Larry W. Mays,et al. Model for the Optimal Rehabilitation and Replacement of Water Distribution System Components , 1987 .
[19] Uri Shamir,et al. An Analytic Approach to Scheduling Pipe Replacement , 1979 .
[20] John H. Holland,et al. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .
[21] Thomas M. Walski,et al. Economic analysis of water main breaks , 1982 .
[22] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[23] Stefano Alvisi,et al. Multiobjective Optimization of Rehabilitation and Leakage Detection Scheduling in Water Distribution Systems , 2009 .
[24] Thomas M. Walski. Predicting Costs of Pipe Cleaning and Lining Projects , 1986 .
[25] George Germanopoulos,et al. A technical note on the inclusion of pressure dependent demand and leakage terms in water supply network models , 1985 .
[26] Thomas M. Walski,et al. Accounting for Phasing of Construction within the Design of Water Distribution Networks , 2014 .
[27] Yehuda Kleiner,et al. Scheduling Renewal of Water Pipes While Considering Adjacency of Infrastructure Works and Economies of Scale , 2010 .
[28] Thomas M. Walski,et al. Predicting Internal Roughness in Water Mains , 1988 .