Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain

Industrial buyers of capital facilities have experienced and continue to experience pressure to reduce facility design and construction lead time. This pressure arises both internally (due to successes in manufacturing lead time reductions) and externally (due to competitive forces including narrowing product delivery windows). This paper presents a case study detailing one owner's efforts to reduce the length and variability of delivery time for long-lead construction materials in order to improve overall project lead time. The owner adopted a long-term multiproject perspective, procuring material in advance of specific projects and holding it at a position in the supply chain selected to allow flexibility for customization. Reduction in lead time of 75% from order to delivery of the material resulted for individual projects within the owner's capital plan. As a result, the material was available at the construction site well in advance of its need for erection. To study if holding material at alternative locations in the supply chain could provide a better match between delivery quantities and the demand for erection, the supply chain was simulated. In this case study, demand information was imprecise, allowing only the quantity of material delivered to be considered rather than matching specific items to specific locations. Nonetheless, the results demonstrate the utility of simulation in the capital projects supply chain and the value of improving demand forecasts.

[1]  Photios G. Ioannou Construction of a dam embankment with nonstationary queues , 1999, WSC '99.

[2]  Gregory A. Howell,et al.  Interaction between subcycles: one key to improved methods , 1993 .

[3]  Srinivasan Raghunathan Interorganizational Collaborative Forecasting and Replenishment Systems and Supply Chain Implications , 1999 .

[4]  A. Law Simulation of manufacturing systems , 1988, WSC '88.

[5]  Deborah Benson Simulation modeling and optimization using ProModel , 1997, WSC '97.

[6]  A. Cox,et al.  Managing construction supply chains: the common sense approach , 2002 .

[7]  J. Forrester Industrial Dynamics , 1997 .

[8]  Iris D. Tommelein,et al.  Effects of a Preferred Vendor Relationship on an Electrical Component Supplier and Electrical Contractor - A Case Study , 2001 .

[9]  Anil Sawhney,et al.  Simulation of the structural steel erection process , 1999, WSC '99.

[10]  Marios C. Angelides,et al.  System dynamics modelling in supply chain management: research review , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[11]  Daniel W. Schunk,et al.  Using simulation to analyze supply chains , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[12]  Ricki G. Ingalls,et al.  CSCAT: the Compaq Supply Chain Analysis Tool , 1999, WSC '99.

[13]  Anil Sawhney,et al.  Implications of Even Flow Production Methodology for U.S. Housing Industry , 2003 .

[14]  Daniel W. Halpin,et al.  Real world applications of construction process simulation , 1999, WSC '99.

[15]  David J. Parsons,et al.  A supply chain case study of a food manufacturing merger , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[16]  Iris D. Tommelein,et al.  Lead time reduction via pre-positioning of inventory in an industrial construction supply chain , 2002, Proceedings of the Winter Simulation Conference.

[17]  Iris D. Tommelein,et al.  Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique , 1998 .

[18]  Iris D. Tommelein,et al.  Contributors to lead time in construction supply chains: case of pipe supports used in power plants , 2002, Proceedings of the Winter Simulation Conference.

[19]  S. Hanson,et al.  Real World Applications , 1997 .

[20]  Sita Bhaskaran Simulation Analysis of a Manufacturing Supply Chain , 1998 .

[21]  Charles R. Harrell,et al.  Simulation modeling and optimization using ProModel , 2000, WSC '00.

[22]  Simaan M. AbouRizk,et al.  Simphony: an environment for building special purpose construction simulation tools , 1999, WSC '99.

[23]  Snehamay Banerjee,et al.  A Decision Support System for Production/ Distribution Planning in Continuous Manufacturing , 2001, Decis. Sci..

[24]  Iris D. Tommelein,et al.  PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE , 1999 .

[25]  Iris D. Tommelein,et al.  INTEGRATED PRODUCT-PROCESS DEVELOPMENT BY A LIGHT FIXTURE MANUFACTURER , 2001 .

[26]  K. C. Er,et al.  Special purpose simulation template for utility tunnel construction , 1999, WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038).

[27]  Jayashankar M. Swaminathan,et al.  Modeling Supply Chain Dynamics: A Multiagent Approach , 1998 .

[28]  Lauri Koskela,et al.  The four roles of supply chain management in construction , 2000 .

[29]  A. Cox Power, value and supply chain management , 1999 .

[30]  Lauri Koskela,et al.  Roles of supply chain management in construction , 1999 .

[31]  Russell E. King,et al.  Quick response replenishment: a case study , 1999, WSC '99.

[32]  Janis Trone,et al.  Simulation of waste processing, transportation, and disposal operations , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[33]  George Archibald,et al.  Supply chain vs. supply chain: using simulation to compete beyond the four walls , 1999, WSC '99.

[34]  Charles J. Miller,et al.  Analysis of the virtual enterprise using distributed supply chain modeling and simulation: an application of e-SCOR , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[35]  Robert Damelio,et al.  The Basics of Process Mapping , 1996 .

[36]  Iris D. Tommelein Discrete-Event Simulation of Lean Construction Processes , 1997 .

[37]  Simaan M. AbouRizk,et al.  Special purpose simulation template for utility tunnel construction , 1999, WSC '99.