Optimal production run length for deteriorating production system with a two-state continuous-time Markovian processes under allowable shortages

The paper studies optimal production run length for a deteriorating production system in which the shortages are allowed and the deterioration processes are characterized by a two-state continuous-time Markov chain. We show that there exists a unique optimal production run length to minimize the expected total relevant cost. In addition, bounds for the optimal production run length are provided to develop the solution procedure. Finally, a numerical example is given to illustrate the results and sensitivity analysis is also performed

[1]  I. Djamaludin,et al.  Quality control through lot sizing for items sold with warranty , 1994 .

[2]  G. Thomas Calculus and Analytic Geometry , 1953 .

[3]  Viliam Makis,et al.  An EMQ model with inspections and random machine failures , 1998, J. Oper. Res. Soc..

[4]  Sheng-Tsaing Tseng,et al.  Optimal Preventive Maintenance Policy for Deteriorating Production Systems , 1996 .

[5]  T.C.E. Cheng,et al.  An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes , 1991 .

[6]  Hau L. Lee,et al.  Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework , 1992 .

[7]  Sudeep Sarkar,et al.  Optimal preventive maintenance in a production inventory system , 1999 .

[8]  Sheng-Tsaing Tseng,et al.  Optimal production run length for products sold with warranty , 2000, Eur. J. Oper. Res..

[9]  Viliam Makis Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections , 1998 .

[10]  Mohamed Ben-Daya,et al.  The economic production lot-sizing problem with imperfect production processes and imperfect maintenance , 2002 .

[11]  Meir J. Rosenblatt,et al.  A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay , 1989 .

[12]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[13]  Chang Hyun Kim,et al.  An extended EMQ model for a failure prone machine with general lifetime distribution , 1997 .

[14]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[15]  Shey-Huei Sheu,et al.  Optimal lot sizing for products sold under free-repair warranty , 2003, Eur. J. Oper. Res..

[16]  L. Zurich,et al.  Operations Research in Production Planning, Scheduling, and Inventory Control , 1974 .