Optimal production run length for deteriorating production system with a two-state continuous-time Markovian processes under allowable shortages
暂无分享,去创建一个
[1] I. Djamaludin,et al. Quality control through lot sizing for items sold with warranty , 1994 .
[2] G. Thomas. Calculus and Analytic Geometry , 1953 .
[3] Viliam Makis,et al. An EMQ model with inspections and random machine failures , 1998, J. Oper. Res. Soc..
[4] Sheng-Tsaing Tseng,et al. Optimal Preventive Maintenance Policy for Deteriorating Production Systems , 1996 .
[5] T.C.E. Cheng,et al. An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes , 1991 .
[6] Hau L. Lee,et al. Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework , 1992 .
[7] Sudeep Sarkar,et al. Optimal preventive maintenance in a production inventory system , 1999 .
[8] Sheng-Tsaing Tseng,et al. Optimal production run length for products sold with warranty , 2000, Eur. J. Oper. Res..
[9] Viliam Makis. Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections , 1998 .
[10] Mohamed Ben-Daya,et al. The economic production lot-sizing problem with imperfect production processes and imperfect maintenance , 2002 .
[11] Meir J. Rosenblatt,et al. A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay , 1989 .
[12] Evan L. Porteus. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..
[13] Chang Hyun Kim,et al. An extended EMQ model for a failure prone machine with general lifetime distribution , 1997 .
[14] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[15] Shey-Huei Sheu,et al. Optimal lot sizing for products sold under free-repair warranty , 2003, Eur. J. Oper. Res..
[16] L. Zurich,et al. Operations Research in Production Planning, Scheduling, and Inventory Control , 1974 .