Binary integer programming formulations for scheduling in market-driven foundries

This paper describes the development and solution of binary integer formulations for production scheduling problems in market-driven foundries. This industrial sector is comprised of small and mid-sized companies with little or no automation, working with diversified production, involving several different metal alloy specifications in small tailor-made product lots. The characteristics and constraints involved in a typical production environment at these industries challenge the formulation of mathematical programming models that can be computationally solved when considering real applications. However, despite the interest on the part of these industries in counting on effective methods for production scheduling, there are few studies available on the subject. The computational tests prove the robustness and feasibility of proposed models in situations analogous to those found in production scheduling at the analyzed industrial sector.

[1]  Jacques Teghem,et al.  A mixed-integer linear programming model for the continuous casting planning , 2006 .

[2]  Peter Cowling,et al.  A flexible decision support system for steel hot rolling mill scheduling , 2003, Comput. Ind. Eng..

[3]  Paolo Toth,et al.  Optimization engineering techniques for the exact solution of NP-hard combinatorial optimization problems , 2000, Eur. J. Oper. Res..

[4]  Reinaldo Morabito,et al.  Solution approaches for the soft drink integrated production lot sizing and scheduling problem , 2009, Eur. J. Oper. Res..

[5]  Karla Hoffman,et al.  Combinatorial optimization: current successes and directions for the future , 2000 .

[6]  Michael Pinedo,et al.  Planning and Scheduling in Manufacturing and Services , 2008 .

[7]  Kai A. Olsen,et al.  Optimal and heuristic solutions for a scheduling problem arising in a foundry , 2005, Comput. Oper. Res..

[8]  Elisangela dos Santos-Meza,et al.  Production , Manufacturing and Logistics A lot-sizing problem in an automated foundry , 2002 .

[9]  Egon Balas Some thoughts on the development of integer programming during my research career - lecture delivered upon receiving the EURO Gold Medal, July 9, 2001, Rotterdam , 2002, Eur. J. Oper. Res..

[10]  Herbert Meyr,et al.  The general lotsizing and scheduling problem , 1997 .

[11]  Simone Zanoni,et al.  Model and analysis of integrated production-inventory system: The case of steel production , 2005 .

[12]  A. Subash Babu,et al.  Evolving requirements for a reengineering model for ferrous foundries in India -- An experience , 1997 .

[13]  Alistair R. Clark,et al.  Lot sizing and furnace scheduling in small foundries , 2008, Comput. Oper. Res..

[14]  Alf Kimms,et al.  Lot sizing and scheduling -- Survey and extensions , 1997 .

[15]  Dario Pacciarelli,et al.  Production scheduling in a steelmaking-continuous casting plant , 2004, Comput. Chem. Eng..

[16]  Lixin Tang,et al.  A review of planning and scheduling systems and methods for integrated steel production , 2001, Eur. J. Oper. Res..

[17]  John L. Burbidge Period Batch Control , 1988, Computer-Aided Production Management.

[18]  Laurence A. Wolsey,et al.  Production Planning by Mixed Integer Programming , 2010 .

[19]  Hanif D. Sherali,et al.  Evolution and state-of-the-art in integer programming , 2000 .

[20]  Atef Fahim,et al.  A two-phase optimization procedure for integer programming problems , 2001 .

[21]  Changchun Pan,et al.  A method of solving a large-scale rolling batch scheduling problem in steel production using a variant of column generation , 2009, Comput. Ind. Eng..

[22]  David Johnson,et al.  Developing software for generating pouring schedules for steel foundries , 2001 .