Binary integer programming formulations for scheduling in market-driven foundries
暂无分享,去创建一个
[1] Jacques Teghem,et al. A mixed-integer linear programming model for the continuous casting planning , 2006 .
[2] Peter Cowling,et al. A flexible decision support system for steel hot rolling mill scheduling , 2003, Comput. Ind. Eng..
[3] Paolo Toth,et al. Optimization engineering techniques for the exact solution of NP-hard combinatorial optimization problems , 2000, Eur. J. Oper. Res..
[4] Reinaldo Morabito,et al. Solution approaches for the soft drink integrated production lot sizing and scheduling problem , 2009, Eur. J. Oper. Res..
[5] Karla Hoffman,et al. Combinatorial optimization: current successes and directions for the future , 2000 .
[6] Michael Pinedo,et al. Planning and Scheduling in Manufacturing and Services , 2008 .
[7] Kai A. Olsen,et al. Optimal and heuristic solutions for a scheduling problem arising in a foundry , 2005, Comput. Oper. Res..
[8] Elisangela dos Santos-Meza,et al. Production , Manufacturing and Logistics A lot-sizing problem in an automated foundry , 2002 .
[9] Egon Balas. Some thoughts on the development of integer programming during my research career - lecture delivered upon receiving the EURO Gold Medal, July 9, 2001, Rotterdam , 2002, Eur. J. Oper. Res..
[10] Herbert Meyr,et al. The general lotsizing and scheduling problem , 1997 .
[11] Simone Zanoni,et al. Model and analysis of integrated production-inventory system: The case of steel production , 2005 .
[12] A. Subash Babu,et al. Evolving requirements for a reengineering model for ferrous foundries in India -- An experience , 1997 .
[13] Alistair R. Clark,et al. Lot sizing and furnace scheduling in small foundries , 2008, Comput. Oper. Res..
[14] Alf Kimms,et al. Lot sizing and scheduling -- Survey and extensions , 1997 .
[15] Dario Pacciarelli,et al. Production scheduling in a steelmaking-continuous casting plant , 2004, Comput. Chem. Eng..
[16] Lixin Tang,et al. A review of planning and scheduling systems and methods for integrated steel production , 2001, Eur. J. Oper. Res..
[17] John L. Burbidge. Period Batch Control , 1988, Computer-Aided Production Management.
[18] Laurence A. Wolsey,et al. Production Planning by Mixed Integer Programming , 2010 .
[19] Hanif D. Sherali,et al. Evolution and state-of-the-art in integer programming , 2000 .
[20] Atef Fahim,et al. A two-phase optimization procedure for integer programming problems , 2001 .
[21] Changchun Pan,et al. A method of solving a large-scale rolling batch scheduling problem in steel production using a variant of column generation , 2009, Comput. Ind. Eng..
[22] David Johnson,et al. Developing software for generating pouring schedules for steel foundries , 2001 .