CONSTRUCTION PRODUCTIVITY MEASUREMENT : A COMPARISON OF TWO CASE STUDIES
暂无分享,去创建一个
[1] H. Randolph Thomas,et al. Factor Model of Construction Productivity , 1987 .
[2] Jan Jonsson. Construction site productivity measurements : selection, application and evaluation of methods and measures , 1996 .
[3] Malcolm Horner,et al. Characteristic items - a new approach to pricing and controlling construction projects , 1996 .
[4] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .
[5] H R Thomas. SCHEDULE ACCELERATION, WORK FLOW, AND LABOR PRODUCTIVITY , 2000 .
[6] Graham Winch,et al. Benchmarking on-site productivity in France and the UK: a CALIBRE approach , 2001 .
[7] S. Groák. Is construction an industry , 1994 .
[8] Serdar Ulubeyli,et al. A different approach to construction labour in Turkey: comparative productivity analysis , 2004 .
[9] Paul. Olomolaiye,et al. An evaluation of the relationships between bricklayers' motivation and productivity , 1990 .
[10] Gary David Holt,et al. Construction resource/method factors influencing productivity for high rise concrete construction , 1999 .
[11] R. Malcolm W. Horner,et al. The evidence of complex variability in construction labour productivity , 2002 .
[12] Paul Chan,et al. Construction labour productivity improvements , 2003 .
[13] Awad S. Hanna,et al. Planned and unplanned schedule compression: the impact on labour , 1998 .
[14] H. Randolph Thomas. Labor Productivity and Work Sampling: The Bottom Line , 1991 .