Fuzzy Activity Network Method for Project Scheduling Under Resource Constraints
暂无分享,去创建一个
[1] Ario Ohsato,et al. Solving the Resource-Constrained Project Scheduling Problem by Genetic Algorithm( Global Supply Chain Management) , 2007 .
[2] Stephen L. Cabano,et al. Project management in the fast lane , 2001 .
[3] Caroline M. Eastman,et al. Review: Introduction to fuzzy arithmetic: Theory and applications : Arnold Kaufmann and Madan M. Gupta, Van Nostrand Reinhold, New York, 1985 , 1987, Int. J. Approx. Reason..
[4] F A Lootsma,et al. THEORY AND METHODOLOGY STOCHASTIC AND FUZZY PERT , 1989 .
[5] Igor Gazdik. Fuzzy-Network Planning - FNET , 1983, IEEE Transactions on Reliability.
[6] Ofer Zwikael,et al. Non-delay scheduling as a managerial approach for managing projects , 2006 .
[7] Jerome D. Wiest. Some Properties of Schedules for Large Projects with Limited Resources , 1964 .
[8] F. Lootsma. Stochastic and Fuzzy Pert , 1989 .
[9] Goldberg,et al. Genetic algorithms , 1993, Robust Control Systems with Genetic Algorithms.
[10] Jan Węglarz,et al. Project scheduling : recent models, algorithms, and applications , 1999 .
[11] Osama Moselhi,et al. Project-network analysis using fuzzy sets theory , 1996 .
[12] Erik Demeulemeester,et al. Critical Chain Project Scheduling: Do Not Oversimplify , 2002 .
[13] Ario Ohsato,et al. Project Schedule Management Using a Fuzzy Activity Network Considering Resource and Environmental Factors , 2006 .
[14] Willy Herroelen,et al. On the merits and pitfalls of critical chain scheduling , 2000 .
[15] Weng Tat Chan,et al. CONSTRUCTION RESOURCE SCHEDULING WITH GENETIC ALGORITHMS , 1996 .
[16] James E. Diekmann,et al. Soft Logic in Network Analysis , 1988 .
[17] D. Malcolm,et al. Application of a Technique for Research and Development Program Evaluation , 1959 .
[18] Wei-Chih Wang. Impact of soft logic on the probabilistic duration of construction projects , 2005 .
[19] S. Chanas,et al. THE USE OF FUZZY VARIABLES IN PERT , 1981 .