The uncertainty recovery analysis for interdependent infrastructure systems using the dynamic inoperability input–output model

In this paper, an innovatory modelling framework is proposed to conduct the uncertainty recovery analysis for the interdependent infrastructure sectors based on the dynamic inoperability input–output model (DIIM). The DIIM captures the inoperability of infrastructure systems, and therefore can easily analyse how perturbations propagate among interconnected infrastructures and how to implement effective mitigation efforts after a disaster. In this paper, based on the random recovery time distribution, we apply the Monte Carlo simulation to obtain the distributions of the economic losses for the critical interdependent infrastructure sectors after a disaster. The proposed method can provide the decision-makers the guidance in making suitable risk-management decisions as well as how the risks can be mitigated, if the disaster cannot be avoided to happen in the first place.

[1]  Joost R. Santos,et al.  Modeling the Demand Reduction Input‐Output (I‐O) Inoperability Due to Terrorism of Interconnected Infrastructures * , 2004, Risk analysis : an official publication of the Society for Risk Analysis.

[2]  Huicong Jia,et al.  Resilience to natural hazards: a geographic perspective , 2010 .

[3]  Matthias Schroder,et al.  Input–Output Analysis , 2011 .

[4]  Ming Dong,et al.  Inoperability input‐output modeling (IIM) of disruptions to supply chain networks , 2010, Syst. Eng..

[5]  Yacov Y. Haimes,et al.  Managing the risk of terrorism to interdependent infrastructure systems through the dynamic inoperability input–output model , 2006, Syst. Eng..

[6]  B. Hu,et al.  Identification of filter management strategy in fluid power systems under uncertainty: an interval-fuzzy parameter integer nonlinear programming method , 2011, Int. J. Syst. Sci..

[7]  Joost R. Santos,et al.  Estimating Workforce-Related Economic Impact of a Pandemic on the Commonwealth of Virginia , 2009, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.

[8]  Yacov Y Haimes,et al.  Systemic Valuation of Strategic Preparedness Through Application of the Inoperability Input‐Output Model with Lessons Learned from Hurricane Katrina , 2007, Risk analysis : an official publication of the Society for Risk Analysis.

[9]  Joost R Santos,et al.  Pandemic Recovery Analysis Using the Dynamic Inoperability Input‐Output Model , 2009, Risk analysis : an official publication of the Society for Risk Analysis.

[10]  Joost R. Santos,et al.  International Trade Inoperability Input‐Output Model (IT‐IIM): Theory and Application , 2009, Risk analysis : an official publication of the Society for Risk Analysis.

[11]  A. O'Hagan,et al.  Statistical Methods for Eliciting Probability Distributions , 2005 .

[12]  Y. Haimes,et al.  Risk Management for Leontief‐Based Interdependent Systems , 2004, Risk analysis : an official publication of the Society for Risk Analysis.

[13]  Yacov Y. Haimes,et al.  Supply- and Output-Side Extensions to the Inoperability Input-Output Model for Interdependent Infrastructures , 2007 .

[14]  Lei Zhao,et al.  A supplier selection and order allocation problem with stochastic demands , 2011, Int. J. Syst. Sci..

[15]  James H. Lambert,et al.  Inoperability Input-Output Model for Interdependent Infrastructure Sectors. II: Case Studies , 2005 .

[16]  Alexandros Plianos,et al.  Nonlinear airpath control of modern diesel powertrains: a fuzzy systems approach , 2011, Int. J. Syst. Sci..

[17]  Yacov Y. Haimes,et al.  Assessing uncertainty in extreme events: Applications to risk-based decision making in interdependent infrastructure sectors , 2009, Reliab. Eng. Syst. Saf..

[18]  John A. Forester,et al.  Expert elicitation approach for performing ATHEANA quantification , 2004, Reliab. Eng. Syst. Saf..

[19]  Joost R. Santos,et al.  INOPERABILITY INPUT-OUTPUT MODEL 2 . 1 . Background : Leontief Input-Output Model , 2005 .

[20]  Marco Percoco,et al.  On the Local Sensitivity Analysis of the Inoperability Input‐Output Model , 2011, Risk analysis : an official publication of the Society for Risk Analysis.

[21]  Stefano Panzieri,et al.  Agent-based input-output interdependency model , 2010, Int. J. Crit. Infrastructure Prot..

[22]  Joost R. Santos,et al.  Extreme Risk Analysis of Interdependent Economic and Infrastructure Sectors , 2007, Risk analysis : an official publication of the Society for Risk Analysis.

[23]  M. Meek,et al.  IT risk management , 2014 .

[24]  Nancy N. Green Hurricane Katrina. , 2008, The American journal of nursing.

[25]  Dinesh Kumar,et al.  Fuzzy modeling of system behavior for risk and reliability analysis , 2008, Int. J. Syst. Sci..

[26]  Joost R. Santos,et al.  Incorporating Time-Varying Perturbations Into the Dynamic Inoperability Input–Output Model , 2010, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.

[27]  Y. Haimes,et al.  Leontief-Based Model of Risk in Complex Interconnected Infrastructures , 2001 .

[28]  W. Leontief Input-output economics , 1967 .

[29]  Ligang He,et al.  Supply-driven dynamic inoperability input-output price model for interdependent infrastructure systems , 2011 .

[30]  James H. Lambert,et al.  Inoperability Input-Output Model for Interdependent Infrastructure Sectors. I: Theory and Methodology , 2005 .

[31]  Roberto Setola,et al.  A Methodology to Estimate Input-Output Inoperability Model Parameters , 2007, CRITIS.

[32]  Wei Yu,et al.  Parameter uncertainty effects on variance-based sensitivity analysis , 2009, Reliab. Eng. Syst. Saf..

[33]  Roberto Setola,et al.  Critical infrastructure dependency assessment using the input-output inoperability model , 2009, Int. J. Crit. Infrastructure Prot..

[34]  Nicholas R. Farnum,et al.  Some Results Concerning the Estimation of Beta Distribution Parameters in PERT , 1987 .

[35]  Yacov Y. Haimes,et al.  Managing the risk of terrorism to interdependent infrastructure systems through the dynamic inoperability input–output model , 2006 .

[36]  Marco Percoco,et al.  A Note on the Inoperability Input‐Output Model , 2006, Risk analysis : an official publication of the Society for Risk Analysis.

[37]  Kjell Hausken,et al.  Protecting complex infrastructures against multiple strategic attackers , 2011, Int. J. Syst. Sci..

[38]  Bernard Grabot,et al.  Decision support for supply chain planning under uncertainty , 2008, Int. J. Syst. Sci..