Recoverable Robustness in Shunting and Timetabling
暂无分享,去创建一个
Daniele Frigioni | Alfredo Navarra | Serafino Cicerone | Gabriele Di Stefano | Gianlorenzo D'Angelo | Anita Schöbel | Michael Schachtebeck | A. Schöbel | D. Frigioni | A. Navarra | Gianlorenzo D'angelo | Serafino Cicerone | G. Stefano | Michael Schachtebeck
[1] Peter Widmayer,et al. Railway Delay Management: Exploring Its Algorithmic Complexity , 2004, SWAT.
[2] Alfredo Navarra,et al. Recoverable Robust Timetables on Trees , 2009, COCOA.
[3] Alfredo Navarra,et al. Evaluation of Recoverable-Robust Timetables on Tree Networks , 2009, IWOCA.
[4] Peter Widmayer,et al. Online Delay Management on a Single Train Line , 2004, ATMOS.
[5] Melvyn Sim,et al. The Price of Robustness , 2004, Oper. Res..
[6] Riko Jacob. On shunting over a hump , 2011 .
[7] Martine Labbé,et al. Optimization models for the single delay management problem in public transportation , 2008, Eur. J. Oper. Res..
[8] Peter Kall,et al. Stochastic Programming , 1995 .
[9] Bernhard Sendhoff,et al. Robust Optimization - A Comprehensive Survey , 2007 .
[10] Leon Peeters,et al. The Computational Complexity of Delay Management , 2005, WG.
[11] Riko Jacob,et al. Multistage methods for freight train classification , 2007, Networks.
[12] Antonio Alonso Ayuso,et al. Introduction to Stochastic Programming , 2009 .
[13] Daniele Frigioni,et al. Robust Algorithms and Price of Robustness in Shunting Problems , 2007, ATMOS.
[14] Allan Borodin,et al. Online computation and competitive analysis , 1998 .
[15] Rolf H. Möhring,et al. Robust and Online Large-Scale Optimization: Models and Techniques for Transportation Systems , 2009, Robust and Online Large-Scale Optimization.
[16] Anita Schöbel,et al. To Wait or Not to Wait? The Bicriteria Delay Management Problem in Public Transportation , 2007, Transp. Sci..
[17] Rolf H. Möhring,et al. The Concept of Recoverable Robustness, Linear Programming Recovery, and Railway Applications , 2009, Robust and Online Large-Scale Optimization.
[18] Anita Schöbel,et al. A Model for the Delay Management Problem based on Mixed-Integer-Programming , 2001, ATMOS.
[19] Leo Kroon,et al. Algorithmic Methods for Railway Optimization, International Dagstuhl Workshop, Dagstuhl Castle, Germany, June 20-25, 2004, 4th International Workshop, ATMOS 2004, Bergen, Norway, September 16-17, 2004, Revised Selected Papers , 2007, ATMOS.
[20] Anita Schöbel,et al. Integer Programming Approaches for Solving the Delay Management Problem , 2004, ATMOS.
[21] Torben Hagerup,et al. Algorithm Theory - SWAT 2004 , 2004, Lecture Notes in Computer Science.
[22] Daniele Frigioni,et al. Delay Management Problem: Complexity Results and Robust Algorithms , 2008, COCOA.
[23] Ronny S. Hansmann,et al. Optimal Sorting of Rolling Stock at Hump Yards , 2008 .
[24] Serafino Cicerone,et al. Dynamic Algorithms for Recoverable Robustness Problems , 2008, ATMOS.
[25] Matteo Fischetti,et al. Light Robustness , 2009, Robust and Online Large-Scale Optimization.
[26] Sebastian Stiller,et al. Delay resistant timetabling , 2009, Public Transp..
[27] Daniele Frigioni,et al. Recoverable robust timetabling for single delay: Complexity and polynomial algorithms for special cases , 2009, J. Comb. Optim..