Integrated Warfare Requirements Methodology (IWRM). Phase I--feasibility study. Final report

The Integrated Warfare Requirements Methodology (IWRM) Feasibility Study was conducted to determine the feasibility of developing an integrated warfare requirements methodology, using currently available simulations, capable of supporting as European FY90 integrated requirements study programmed to begin in January 1983. This report provides the results of the feasibility study and culminates Phase I - Methodology Feasibility Study of IWRM.