Application of water covers, remote monitoring and data management systems to environmental management at uranium tailings sites in the Serpent River Watershed

Over forty years of uranium mining in the Elliot Lake region of Ontario (1956-1996) has resulted in the production of over 300 million pounds of uranium. With the completion of mining activity, Rio Algom Limited and Denison Mines Limited are utilizing progressive environmental technologies and management systems to reduce and manage the environmental risks associated with the 150 million tonnes of potentially acid-generating tailings in nine regional waste management areas. Water covers designed to reduce oxygen entry and, thereby, significantly inhibit acid generation, have been applied at six of the sites with the Quirke site serving as a demonstration site for the Mine Environmental Neutral Drainage program. All five of Rio Algom Limited's effluent treatment plants are monitored and controlled from a central control station utilizing a Supervisory Control and Data Acquisition (SCADA) system based on Fix Dmacs technology. Scheduling, auditing and reporting of plant operating and environmental monitoring programs for the entire watershed are controlled utilizing the Regional Environmental Information Management System (REIMS). Proper application of these technologies and management systems facilitates delivery of cost-effective environmental monitoring, care and maintenance programs at these sites and provides tools to demonstrate compliance with all environmental performance criteria.