HEURISTIC RESOURCE LEVELING METHOD에 의한 UNLIMITED RESOURCE의 LEVELING에 관한 연구 ( A Study on the Leveling of Unlimited Resource by Heuristic Resource Leveling Method )

Recently, many project control techniques have been applied for the efficiency of construction. They have been used mainly in the area of time such as shortening of duration, but they have been not used in the area of resource such as labor and equipment. Therefore, the purpose of this study is to suggest the basic data of the general application and the development of systematic resource leveling method by comparing and analyzing of Ahuja's method, Burgess' method, Harris'method in Heuristic Resource Leveling methods.