HEURISTIC RESOURCE LEVELING METHOD에 의한 UNLIMITED RESOURCE의 LEVELING에 관한 연구 ( A Study on the Leveling of Unlimited Resource by Heuristic Resource Leveling Method )
暂无分享,去创建一个
Recently, many project control techniques have been applied
for the efficiency of construction. They have been used mainly
in the area of time such as shortening of duration, but they
have been not used in the area of resource such as labor and
equipment.
Therefore, the purpose of this study is to suggest the basic
data of the general application and the development of systematic
resource leveling method by comparing and analyzing of Ahuja's
method, Burgess' method, Harris'method in Heuristic Resource
Leveling methods.