Perception on challenges impacting bid decision of indigenous building contractors in Dar Es Salaam, Tanzania

The acknowledged mode of securing work by contractors is through the bidding process. However, the bidding decisions undertaken by some indigenous contractors in developing countries are fraught with challenges that often engender bidding practices (such as collusion through price fixing and intentional lower bidding) and threaten business survival. Therefore, in the quest to better understand these challenges and viable advocate solutions for overcoming them, this paper aims to identify the key challenges impacting the bid decision process by small indigenous building contractors in Dar es Salaam, Tanzania, and establish the strength of their relationship between the pairs of key challenges.,A comprehensive literature review was conducted to identify nine challenges impacting the bid decision of indigenous building contractors in Tanzania, which were used to design a questionnaire survey. Data collected were analysed using descriptive statistics, mean score, inferential statistics (One sample t-tests), Kendall’s concordance and correlation analysis.,Challenges identified from a literature review were empirically tested using survey responses accrued from 33 participating small indigenous building contractors in Dar es Salaam, Tanzania. The findings illustrate that lack of liquidity, profit returns, lack of equipment, lack of experience of several works and procurement procedures are perceived as being the five most critical challenges. Project location, site accessibility and lack of labour were least critical. The major finding from the correlation analysis was the existence of the strong and positive correlation between “project location” and “site accessibility”.,The study is limited by its sample and geographical settings which focussed and confined the results on one country, Tanzania. However, the findings can be considered as important for other developing countries wishing to gain insights into the challenges impacting bid decisions.,Measures for addressing the identified challenges impacting the bidding decisions of the indigenous small building contractors would be undertaken. The findings will enable contractors to not only reconcile the challenges with the industry and in so doing benefit both themselves and the clients but also enable them to be better prepared to deliver contractual obligations and generate socio-economic wealth. Government and policymakers will also be able to appropriately develop macro interventions for managing these challenges, which could be custom-tailored to indigenous small contractors. Finally, improving the ability of local firms to compete in the construction industry has been recognised as having the potential of advancing socio-economic development within the comity of developing countries.,The study enhances government, client and practitioners’ understanding of the challenges affecting the bidding practices among the indigenous building contractors in Tanzania. This area of investigation has previously been under explored particularly sub-Saharan Africa.

[1]  C. Aigbavboa,et al.  Critical success factors militating against competitive advantage of indigenous construction firms in developing countries , 2020, African Journal of Science, Technology, Innovation and Development.

[2]  P. Olomolaiye,et al.  Infrastructure procurement capacity gaps in Nigeria public sector institutions , 2019, Engineering, Construction and Architectural Management.

[3]  Chukwuemeka Patrick Ogbu,et al.  Direct risk factors and cost performance of road projects in developing countries: Contractors’ perspective , 2019 .

[4]  Georg Strüver,et al.  At Africa’s expense? Disaggregating the employment effects of Chinese mining operations in sub-Saharan Africa , 2019, World Development.

[5]  A. Chan,et al.  Toward a cleaner project procurement: Evaluation of construction projects’ vulnerability to corruption in developing countries , 2019, Journal of Cleaner Production.

[6]  Sadi Assaf,et al.  Factors Affecting Contractors’ Bidding Decisions for Construction Projects in Saudi Arabia , 2019, Buildings.

[7]  J. Owolabi,et al.  BARRIERS AND DRIVERS OF INNOVATION INTHE NIGERIAN CONSTRUCTION INDUSTRY , 2019 .

[8]  N. Chileshe,et al.  Identifying Project Management Practices and Principles for Public–Private Partnerships in Housing Projects: The Case of Tanzania , 2018, Sustainability.

[9]  I. Jefferson,et al.  Public–private partnerships in Tanzanian affordable housing schemes , 2018, Built Environment Project and Asset Management.

[10]  David J. Edwards,et al.  An empirical examination of moral hazards and adverse selection on PPP projects , 2018, Journal of Engineering, Design and Technology.

[11]  G. Kikwasi,et al.  Role of the construction sector and key bottlenecks to supply response in Tanzania , 2018, WIDER Working Paper.

[12]  Douglas Omoregie Aghimien,et al.  Survival strategies of built environment organisations in a challenging economy , 2018, Engineering, Construction and Architectural Management.

[13]  A. Oke Bonding capability of Nigerian contracting firms , 2018, Engineering, Construction and Architectural Management.

[14]  Sope Williams-Elegbe Systemic corruption and public procurement in developing countries: are there any solutions? , 2018, Journal of Public Procurement.

[15]  Ayodeji E. Oke,et al.  SWOT analysis of indigenous and foreign contractors in a developing economy , 2018, International Journal of Quality & Reliability Management.

[16]  I. Jefferson,et al.  An analysis of the delivery challenges influencing public-private partnership in housing projects: The case of Tanzania , 2018 .

[17]  R. Mostaghel,et al.  Circular business model challenges and lessons learned - An industrial perspective , 2018 .

[18]  Muhammad T. Hatamleh,et al.  Factors affecting the accuracy of cost estimate: case of Jordan , 2018 .

[19]  E. Badu,et al.  Factorial analysis of capacity-building needs of small- and medium-scale building contractors in developing countries , 2018 .

[20]  Chukwuemeka Patrick Ogbu,et al.  Survival practices of indigenous construction firms in Nigeria , 2018 .

[21]  Maxwell L. Chisala,et al.  Quantitative Bid or No-Bid Decision-Support Model for Contractors , 2017 .

[22]  E. Badu,et al.  Factors affecting tender price in the Ghanaian construction industry , 2017 .

[23]  Oluwole Alfred Olatunji,et al.  Bid or no-bid decision factors of indigenous contractors in Nigeria , 2017 .

[24]  Murali Sambasivan,et al.  Analysis of delays in Tanzanian construction industry , 2017 .

[25]  Albert P.C. Chan,et al.  Implementation constraints in public-private partnership , 2017 .

[26]  A. Chan,et al.  A survey of critical success factors for attracting private sector participation in water supply projects in developing countries , 2017 .

[27]  Valentine G. M. Luvara,et al.  Growth Trend of Local Building Contractors for the Period of 2005- 2015 in Dar Es Salaam, Tanzania , 2017 .

[28]  Erika Parn,et al.  Research note: Machinery, manumission, and economic machinations , 2017 .

[29]  Adedeji Afolabi,et al.  Factors Affecting Contractors' Bidding Decisions for Construction Projects in Nigeria , 2016 .

[30]  Geraldine Arbogast Rasheli Procurement contract management in the local government authorities (LGAs) in Tanzania: A transaction cost approach , 2016 .

[31]  Nicholas Chileshe,et al.  Critical factors influencing the bid/no bid decision in the Australian construction industry , 2016 .

[32]  To Oladinrin,et al.  Factors influencing success rate of contractors in competitive bidding for construction works in South-East, Nigeria , 2016 .

[33]  Yuda Julius Chatama,et al.  Impact of China’s cooperation: the case of Chinese garages in Tanzania , 2015 .

[34]  J. Amankwah‐Amoah Explaining declining industries in developing countries: The case of textiles and apparel in Ghana , 2015 .

[35]  Nicholas Chileshe,et al.  Critical success factors for implementation of risk assessment and management practices within the Tanzanian construction industry , 2014 .

[36]  J. Rowley Designing and using research questionnaires , 2014 .

[37]  Nicholas Chileshe,et al.  Knowledge management: Barriers to capturing lessons learned from Australian construction contractors perspective , 2014 .

[38]  Stanley Chukwudi,et al.  PARTICIPATION OF INDIGENOUS CONTRACTORS IN NIGERIAN PUBLIC SECTOR CONSTRUCTION PROJECTS AND THEIR CHALLENGES IN MANAGING WORKING CAPITAL , 2014 .

[39]  Ibrahim Saidu,et al.  Assessment of the Factors Affecting Accuracy of Pre-tender Cost Estimate in Kaduna State, Nigeria , 2014 .

[40]  R. Bharose,et al.  Effect of Different Levels of Sewage Sludge on Concentration of Heavy Metals Soil Grow With Cereal Crops , 2014 .

[41]  Liyin Shen,et al.  Key Factors Considered in Compiling Tender Prices for China’s Public Works Projects , 2013 .

[42]  Mohammad S. El-Mashaleh,et al.  Empirical Framework for Making the Bid/No-Bid Decision , 2013 .

[43]  Sherif Ali Mohtady Mohamed,et al.  Factors Affecting the Accuracy of Pre-Tender Cost Estimates in the Gaza Strip , 2013 .

[44]  Wells Jn Informal construction activity in developing countries , 2012 .

[45]  H. Voordijk Contemporary Issues in Construction in Developing Countries , 2012 .

[46]  Benson T.H. Lim,et al.  The effect of bidding success in construction bidding , 2012 .

[47]  Muhammad Asim Tufail,et al.  Transforming Capability of Indigenous Contractors Through Technology Transfer: A Malaysia Experience , 2012 .

[48]  Geraldine J. Kikwasi,et al.  An evaluation of construction skills in Tanzania , 2011 .

[49]  J. Okpara Factors constraining the growth and survival of SMEs in Nigeria: Implications for poverty alleviation , 2011 .

[50]  David Root,et al.  Emerging contractors in South Africa: interactions and learning , 2010 .

[51]  W. Thwala,et al.  An exploratory study of problems facing small contractors in the North West province of South Africa , 2009 .

[52]  A. Bageis,et al.  Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors , 2009 .

[53]  H. Odeyinka,et al.  An evaluation of risk factors impacting construction cash flow forecast , 2008 .

[54]  Christopher Burke China's Entry into Construction Industries in Africa , 2007 .

[55]  Abdulrezak N. Mohamed,et al.  A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions , 2007 .

[56]  Y. Debrah,et al.  Emerging managerial competencies of professionals in the Tanzanian construction industry , 2005 .

[57]  J. Sitzia,et al.  Good practice in the conduct and reporting of survey research. , 2003, International journal for quality in health care : journal of the International Society for Quality in Health Care.

[58]  Cipriano Forza,et al.  Survey research in operations management: a process‐based perspective , 2002 .

[59]  Aminah Robinson Fayek,et al.  A survey of the bidding practices of Canadian civil engineering construction contractors , 1999 .

[60]  Aminah Robinson Fayek,et al.  A Survey of Tendering Practices in the Australian Construction Industry , 1998 .

[61]  Olugboyega Adams,et al.  Contractor development in Nigeria: perceptions of contractors and professionals , 1997 .

[62]  A. Shash Factors considered in tendering decisions by top UK contractors , 1993 .

[63]  R. Fellows,et al.  An examination of the importance of resource considerations when contractors make project selection decisions , 1992 .

[64]  Irtishad Ahmad,et al.  Questionnaire Survey on Bidding in Construction , 1988 .