A New Metaheuristic Algorithm for Long-Term Open-Pit Production Planning / Nowy meta-heurystyczny algorytm wspomagający długoterminowe planowanie produkcji w kopalni odkrywkowej
暂无分享,去创建一个
[1] Nader Fathianpour,et al. Open pit optimization in 3D using a new artificial neural network , 2011 .
[2] Morteza Osanloo,et al. Determination of Open Pit Mining Cut-Off Grade Strategy Using Combination of Nonlinear Programming and Genetic Algorithm , 2011 .
[3] Lou Caccetta,et al. An Application of Branch and Cut to Open Pit Mine Scheduling , 2003, J. Glob. Optim..
[4] Damian Schofield,et al. Inclusion of risk assessment in open-pit design and scheduling , 1995 .
[5] M. Kumral,et al. A simulated annealing approach to mine production scheduling , 2005, J. Oper. Res. Soc..
[6] Peter A. Dowd. Short-term mine production scheduling for industrial minerals using multi-objective simulated annealing , 2002 .
[7] K. Dagdelen,et al. Fundamental tree algorithm in optimising production scheduling for open pit mine design , 2005 .
[8] Behrooz Karimi,et al. Long-term open pit mine production planning: a review of models and algorithms , 2008 .
[9] B. Denby,et al. Genetic algorithms for flexible scheduling of open pit operations , 1998 .
[10] L. M. Giannini. Optimum design of open pit mines , 1991, Bulletin of the Australian Mathematical Society.
[11] Thys B Johnson,et al. OPTIMUM OPEN PIT MINE PRODUCTION SCHEDULING , 1968 .
[12] Javad Sattarvand,et al. Long-term open-pit planning by ant colony optimization , 2012 .