Determination of the effect of operating cost uncertainty on mining project evaluation

Mining projects are complex businesses that demand constant risk assessment. This is because several kinds of uncertainties influence the value of a mine project, typically. These uncertainties may be classified as exploration uncertainties, economic uncertainties and engineering uncertainties. The evaluation of a mine project under these uncertainties is a complicated job, which may lead to making a wrong decision by managers and stockholders. Therefore, at first, the engineers must recognize the mining uncertainties before carrying out the project evaluation. The economic uncertainties are the most important factors, which may affect the project evaluation. Among the mentioned uncertainties, the operating cost uncertainty is an important and effective factor, which is ignored to a certain extent.

[1]  R. Dimitrakopoulos,et al.  Managing risk and waste mining in long-term production scheduling of open-pit mines , 2004 .

[2]  Peter Tufano,et al.  When are Real Options Exercised? An Empirical Study of Mine Closings , 2000 .

[3]  The Institution of Mining and Metallurgy , 1956, Nature.

[4]  G. Davis,et al.  Valuing uncertain asset cash flows when there are no options: A real options approach , 2005 .

[5]  Donald W. Gentry,et al.  Mine Investment Analysis , 1984 .

[6]  L. Trigeorgis The Nature of Option Interactions and the Valuation of Investments with Multiple Real Options , 1993, Journal of Financial and Quantitative Analysis.

[7]  John Frank Charles Kingman,et al.  Stochastic Processes and Their Applications , 1982 .

[8]  Eduardo S. Schwartz,et al.  Evaluating Natural Resource Investments , 1985 .

[9]  Roussos Dimitrakopoulos,et al.  Stochastic optimisation model for open pit mine planning: application and risk analysis at copper deposit , 2007 .

[10]  R. Dimitrakopoulos,et al.  A maximum upside / minimum downside approach to the traditional optimization of open pit mine design , 2007 .

[11]  Erkan Topal,et al.  Adjusted Real Option Valuation to Maximise Mining Project Value - A Case Study Using Century Mine , 2009 .

[12]  Simone Kelly,et al.  A binomial lattice approach for valuing a mining property IPO , 1998 .

[13]  S. Ross,et al.  Option pricing: A simplified approach☆ , 1979 .

[14]  Roussos Dimitrakopoulos,et al.  Moving forward from traditional optimization: grade uncertainty and risk effects in open-pit design , 2002 .

[15]  Raman Uppal,et al.  Valuing risk and flexibility: A comparison of methods , 1996 .

[16]  Ray C. Fair,et al.  Principles of Microeconomics (7th Edition) , 2003 .

[17]  S. A. Abdel Sabour,et al.  Valuing Real Capital Investments Using The Least-Squares Monte Carlo Method , 2006 .