Yield improvement using statistical analysis of process dates
暂无分享,去创建一个
[1] B. Silverman,et al. Nonparametric Regression and Generalized Linear Models: A roughness penalty approach , 1993 .
[2] Adrian F. M. Smith,et al. Sampling-Based Approaches to Calculating Marginal Densities , 1990 .
[3] D.A. James,et al. A mathematical model for defect impact based on in-line vs test data correlations , 1999, 10th Annual IEEE/SEMI. Advanced Semiconductor Manufacturing Conference and Workshop. ASMC 99 Proceedings (Cat. No.99CH36295).
[4] R. M. Gardner,et al. Solving tough semiconductor manufacturing problems using data mining , 2000, 2000 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop. ASMC 2000 (Cat. No.00CH37072).
[5] P. Green. Reversible jump Markov chain Monte Carlo computation and Bayesian model determination , 1995 .
[6] W. K. Hastings,et al. Monte Carlo Sampling Methods Using Markov Chains and Their Applications , 1970 .
[7] Allan Y. Wong. A statistical approach to identify semiconductor process equipment related yield problems , 1997, 1997 IEEE International Symposium on Defect and Fault Tolerance in VLSI Systems.
[8] Fourmun Lee. Advanced yield enhancement: integrated yield analysis , 1997, 1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop ASMC 97 Proceedings.
[9] Leo Breiman,et al. Classification and Regression Trees , 1984 .
[10] F. Mieno,et al. Yield improvement using data mining system , 1999, 1999 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat No.99CH36314).
[11] J. Durham,et al. A statistical method for correlating in-line defectivity to probe yield , 1997, 1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop ASMC 97 Proceedings.
[12] Adrian F. M. Smith,et al. Automatic Bayesian curve fitting , 1998 .
[13] Sylvia Richardson,et al. Markov Chain Monte Carlo in Practice , 1997 .
[14] N. Metropolis,et al. Equation of State Calculations by Fast Computing Machines , 1953, Resonance.
[15] P. Besse,et al. Recherche d'une étape défaillante dans un procédé industriel : Quand le désordre est source d'information , 1999 .
[16] A. Y. Wong. A systematic approach to identify critical yield sensitive parametric parameters , 1997, 1997 2nd International Workshop on Statistical Metrology.
[17] Hal S. Stern,et al. Neural networks in applied statistics , 1996 .
[18] Thomas P. Ryan,et al. Statistical methods for quality improvement , 1989 .
[19] E. A. Sack. Global yield engineering for IC production , 1998 .
[20] Kazunori Nemoto,et al. A new systematic yield ramp methodology , 1999, 10th Annual IEEE/SEMI. Advanced Semiconductor Manufacturing Conference and Workshop. ASMC 99 Proceedings (Cat. No.99CH36295).
[21] Kamal Rajkanan. Yield analysis methodology for low defectivity wafer fabs , 2000, Records of the IEEE International Workshop on Memory Technology, Design and Testing.
[22] Ping Wang,et al. Factory start-up and production ramp: yield improvement through signature analysis and visual/electrical correlation , 1995, Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop.
[23] David Jensen,et al. Integrated yield management , 1999 .
[24] Costas J. Spanos,et al. Semiconductor yield improvement: results and best practices , 1995 .