A Knowledge-Based System for Assembly Sequence Planning

To save time and cost in assembly process and to improve the quality of products, it is very important to choose an optimal assembly sequence. In this paper, we propose a methodology that generates an optimal assembly sequence by using various methods and the knowledge of experts. To illustrate the effectiveness of the proposed methodology, a knowledge-based system is developed. The built system is applied to the case of UBR(Unit Bath Room). The applying result showed the applicability of the developed system.

[1]  David Ben-Arieh,et al.  A methodology for analysis of assembly operations’ difficulty , 1994 .

[2]  E. Pagello,et al.  On the scenario and heuristics of disassemblies , 1994, Proceedings of the 1994 IEEE International Conference on Robotics and Automation.

[3]  Jan D. Wolter On the automatic generation of assembly plans , 1989, Proceedings, 1989 International Conference on Robotics and Automation.

[4]  Randall H. Wilson,et al.  A survey of constraints in automated assembly planning , 1996, Proceedings of IEEE International Conference on Robotics and Automation.

[5]  Peihua Gu,et al.  CAD-directed automatic assembly sequence planning , 1995 .

[6]  Yeo-Hung Yun,et al.  Robust Control of a Glass Fiber Composite Beam using μ-Synthesis Algorithm , 2000 .

[7]  Dong-Woo Cho,et al.  Evaluating Stability of a Transient Cut during Endmilling using the Dynamic Cutting Force Model , 2000 .

[8]  Hans Kurt Tönshoff,et al.  A knowledge-based system for automated assembly planning , 1992 .