Minimizing the weighted number of tardy jobs on a single machine with release dates
暂无分享,去创建一个
[1] Ruslan Sadykov. A Hybrid Branch-And-Cut Algorithm for the One-Machine Scheduling Problem , 2004, CPAIOR.
[2] L. B. J. M. Sturm. A Simple Optimality Proof of Moore's Sequencing Algorithm , 1970 .
[3] Martin Dyer,et al. AN O(n) ALGORITHM FOR THE MULTIPLE-CHOICE , 2007 .
[4] Guochun Tang. A new branch and bound algorithm for minimizing the weighted number of tardy jobs , 1990 .
[5] Stéphane Dauzère-Pérès,et al. Minimizing late jobs in the general one machine scheduling problem , 1995 .
[6] E. L. Lawler,et al. Knapsack-like scheduling problems, the Moore-Hodgson algorithm and the 'tower of sets' property , 1994 .
[7] L. V. Wassenhove,et al. Algorithms for scheduling a single machine to minimize the weighted number of late jobs , 1988 .
[8] Stéphane Dauzère-Pérès,et al. An Exact Method to Minimize the Number of Tardy Jobs in Single Machine Scheduling , 2004, J. Sched..
[9] J. M. Moore. An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs , 1968 .
[10] R. L. Bulfin,et al. Minimizing the weighted number of tardy jobs on a single machine , 2003, Eur. J. Oper. Res..
[11] Toshihide Ibaraki,et al. A Solvable Case of the One-Machine Scheduling Problem with Ready and Due Times , 1978, Oper. Res..
[12] Laurent Péridy,et al. Using short-term memory to minimize the weighted number of late jobs on a single machine , 2003, Eur. J. Oper. Res..
[13] Stéphane Dauzère-Pérès,et al. Using Lagrangean relaxation to minimize the weighted number of late jobs on a single machine , 2003 .
[14] Robert L. Bulfin,et al. Scheduling a Single Machine to Minimize the Weighted Number of Tardy Jobs , 1983 .
[15] Philippe Baptiste,et al. An O(n4) algorithm for preemptive scheduling of a single machine to minimize the number of late jobs , 1999, Oper. Res. Lett..
[16] T. S. Abdul-Razaq,et al. Dynamic Programming State-Space Relaxation for Single-Machine Scheduling , 1988 .
[17] E. L. Lawler,et al. A dynamic programming algorithm for preemptive scheduling of a single machine to minimize the number of late jobs , 1991 .
[18] Philippe Baptiste,et al. A branch and bound to minimize the number of late jobs on a single machine with release time constraints , 2003, Eur. J. Oper. Res..
[19] Raymond E. Miller,et al. Complexity of Computer Computations , 1972 .
[20] Sartaj Sahni,et al. Algorithms for Scheduling Independent Tasks , 1976, J. ACM.
[21] J. M. Moore,et al. A Functional Equation and its Application to Resource Allocation and Sequencing Problems , 1969 .
[22] Jan Karel Lenstra,et al. Complexity of machine scheduling problems , 1975 .
[23] Philippe Baptiste,et al. Polynomial time algorithms for minimizing the weighted number of late jobs on a single machine with equal processing times , 1999 .
[24] Marshall L. Fisher,et al. A dual algorithm for the one-machine scheduling problem , 1976, Math. Program..
[25] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .