Deriving Enterprise-Based Measures Using the Balanced Scorecard and Goal-Driven Measurement Techniques

Abstract : This technical note describes the synergistic application of the balanced scorecard and goal- driven measurement methodologies to develop measures and associated indicators for measuring an organization's health and performance. Through this iterative approach, an organization's strategic goals and subgoals are mapped to the balanced scorecard and refined. The goal -question-(indicator) -measurement methodology is then applied to identify indicators and measures for each scorecard dimension. A hypothetical example of how to apply the methodology at a 'typical' organization performing software development and maintenance activities is provided. The example yields typical indicators to illustrate the methodology.

[1]  David A. Norton Norton , 2000, The Lancet.

[2]  Robert E. Park,et al.  Software Size Measurement: A Framework for Counting Source Statements , 1992 .

[3]  Egon Berghout,et al.  The Goal/Question/Metric Method: , 2000 .

[4]  H. D. Rombach,et al.  Improving software maintenance through measurement , 1989 .

[5]  Thomas P. Flanders,et al.  Performing Organization Name(s) and Address(es) , 2001 .

[6]  Reginald N. Meeson,et al.  Survey of Software Metrics in the Department of Defense and Industry , 1994 .

[7]  David McClure,et al.  Executive Guide: Measuring Performance and Demonstrating Results of Information Technology Investments , 1998 .

[8]  William A. Florac,et al.  Goal-Driven Software Measurement. A Guidebook. , 1996 .

[9]  Victor R. Basili,et al.  The TAME Project: Towards Improvement-Oriented Software Environments , 1988, IEEE Trans. Software Eng..

[10]  William A. Florac Software Quality Measurement: A Framework for Counting Problems and Defects , 1992 .

[11]  Victor R. Basili,et al.  A Methodology for Collecting Valid Software Engineering Data , 1984, IEEE Transactions on Software Engineering.

[12]  Lionel C. Briand,et al.  Practical guidelines for measurement-based process improvement , 1996, Softw. Process. Improv. Pract..

[13]  Norman E. Fenton,et al.  Software Metrics: A Rigorous Approach , 1991 .

[14]  Elizabeth K. Bailey,et al.  Software Effort and Schedule Measurement: A Framework for Counting Staff-Hours and Reporting Schedule Information , 1992 .