Deriving Enterprise-Based Measures Using the Balanced Scorecard and Goal-Driven Measurement Techniques
暂无分享,去创建一个
[1] David A. Norton. Norton , 2000, The Lancet.
[2] Robert E. Park,et al. Software Size Measurement: A Framework for Counting Source Statements , 1992 .
[3] Egon Berghout,et al. The Goal/Question/Metric Method: , 2000 .
[4] H. D. Rombach,et al. Improving software maintenance through measurement , 1989 .
[5] Thomas P. Flanders,et al. Performing Organization Name(s) and Address(es) , 2001 .
[6] Reginald N. Meeson,et al. Survey of Software Metrics in the Department of Defense and Industry , 1994 .
[7] David McClure,et al. Executive Guide: Measuring Performance and Demonstrating Results of Information Technology Investments , 1998 .
[8] William A. Florac,et al. Goal-Driven Software Measurement. A Guidebook. , 1996 .
[9] Victor R. Basili,et al. The TAME Project: Towards Improvement-Oriented Software Environments , 1988, IEEE Trans. Software Eng..
[10] William A. Florac. Software Quality Measurement: A Framework for Counting Problems and Defects , 1992 .
[11] Victor R. Basili,et al. A Methodology for Collecting Valid Software Engineering Data , 1984, IEEE Transactions on Software Engineering.
[12] Lionel C. Briand,et al. Practical guidelines for measurement-based process improvement , 1996, Softw. Process. Improv. Pract..
[13] Norman E. Fenton,et al. Software Metrics: A Rigorous Approach , 1991 .
[14] Elizabeth K. Bailey,et al. Software Effort and Schedule Measurement: A Framework for Counting Staff-Hours and Reporting Schedule Information , 1992 .