Machine and Labor Flexibility in Manufacturing Networks

Many industrial companies today operate under strict employment legislation and work agreements. Since flexible capacity has been widely recognized as an important hedge against uncertain demand, there exist strong efforts to introduce more flexible workforce models. In this paper, we investigate the benefits of such labor flexibility and its interplay with machine flexibility from a network capacity investment perspective. We consider a firm that has to invest simultaneously in labor and machine capacity under uncertain demand and a given network configuration while anticipating the deployment of labor flexibility after demand has been realized. Instruments of labor flexibility range from temporary employment to personnel transfers between plants. The underlying decision problem is formulated as a two-stage stochastic program with recourse. Based on numerical studies and the analysis of a stylized model, we demonstrate the impact of labor flexibility on the optimal levels of machine and labor capacity. We compare the benefits obtained by personnel transfers with those of temporary workers and find that temporary employment always decreases the number of permanent workers, while personnel transfers may even allow for a larger workforce. Our results further indicate that personnel transfers are more effective in larger manufacturing networks although these benefits are decreasing when most plants in the network are capable of producing more than one product (machine flexibility). Finally, we present evidence for the efficiency of a combined usage of personnel transfers and temporary workers.

[1]  William C. Jordan,et al.  Principles on the benefits of manufacturing process flexibility , 1995 .

[2]  Kenneth K. Boyer,et al.  Manufacturing flexibility at the plant level , 1996 .

[3]  Fikri Karaesmen,et al.  ON THE INTERACTION BETWEEN RESOURCE FLEXIBILITY AND FLEXIBILITY STRUCTURES , 2005 .

[4]  Lauren Xiaoyuan Lu,et al.  Multi-market Facility Network Design with O ff shoring Applications , 2007 .

[5]  Michael J. Magazine,et al.  On the trade-offs between risk pooling and logistics costs in a multi-plant network with commonality , 2005 .

[6]  S. Graves,et al.  Supply chain management : design, coordination and operation , 2003 .

[7]  Charu Chandra,et al.  Evaluation of enterprise-level benefits of manufacturing flexibility , 2005 .

[8]  Lauren Xiaoyuan Lu,et al.  Multimarket Facility Network Design with OffShoring Applications , 2009, Manuf. Serv. Oper. Manag..

[9]  Stephen P. Boyd,et al.  Convex Optimization , 2004, Algorithms and Theory of Computation Handbook.

[10]  Serguei Netessine,et al.  Capacity Investment and the Interplay between Volume Flexibility and Product Flexibility , 2005 .

[11]  Robert J. Vokurka,et al.  A review of empirical research on manufacturing flexibility , 2000 .

[12]  Stefan Minner,et al.  Strategic Process Flexibility under Lifecycle Demand , 2009 .

[13]  M. Tzur,et al.  The multilocation transshipment problem , 2006 .

[14]  Leena Suhl,et al.  Flexibility Planning in Automotive Plants , 2007 .

[15]  Nils Rudi,et al.  Newsvendor Networks: Inventory Management and Capacity Investment with Discretionary Activities , 2002, Manuf. Serv. Oper. Manag..

[16]  Manoj K. Malhotra,et al.  A theoretical framework for analyzing the dimensions of manufacturing flexibility , 1999 .

[17]  P. Hammond,et al.  Essential Mathematics for Economic Analysis , 2002 .

[18]  G. D. Eppen Note---Effects of Centralization on Expected Costs in a Multi-Location Newsboy Problem , 1979 .

[19]  D. Gerwin Manufacturing flexibility: a strategic perspective , 1993 .

[20]  P. Chang,et al.  On the Effect of Centralization on Expected Costs in a Multi-Location Newsboy Problem , 1991 .

[21]  Nils Rudi,et al.  A Two-Location Inventory Model with Transshipment and Local Decision Making , 2001, Manag. Sci..

[22]  Jan A. Van Mieghem Note - Commonality Strategies: Value Drivers and Equivalence with Flexible Capacity and Inventory Substitution , 2004, Manag. Sci..

[23]  J. V. Mieghem,et al.  Mix, Time, and Volume Flexibility: Valuation and Corporate Diversification , 2012 .

[24]  Jwm Will Bertrand,et al.  Supply Chain Design: Flexibility Considerations , 2003, Supply Chain Management.

[25]  Charles H. Fine,et al.  Optimal investment in product-flexible manufacturing capacity , 1990 .

[26]  J. V. Mieghem Investment Strategies for Flexible Resources , 1998 .

[27]  Wallace J. Hopp,et al.  Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers , 2004, Manag. Sci..

[28]  Charles H. Fine,et al.  An Empirical Study of Manufacturing Flexibility in Printed Circuit Board Assembly , 1996, Oper. Res..

[29]  A. Raturi,et al.  Sources of volume flexibility and their impact on performance , 2002 .

[30]  Bernhard Fleischmann,et al.  Strategic Planning of BMW's Global Production Network , 2006, Interfaces.

[31]  Bernhard Wild,et al.  Manpower capacity planning -- A hierarchical approach , 1993 .

[32]  Thomas L. Magnanti,et al.  Applied Mathematical Programming , 1977 .

[33]  Edieal J. Pinker,et al.  Optimizing the use of contingent labor when demand is uncertain , 2003, Eur. J. Oper. Res..

[34]  Dirk C. Mattfeld,et al.  Management logistischer Netzwerke , 2007 .