Advancement of the RHIC beam abort kicker system

As one of the most critical system for RHIC operation, the beam abort kicker system has to be highly available, reliable, and stable for the entire operating range. Along with the RHIC commission and operation, consistent efforts have been spend to cope with immediate issues as well as inherited design issues. Major design changes have been implemented to achieve the higher operating voltage, longer high voltage hold-off time, fast retriggering and redundant triggering, and improved system protection, etc. Recent system test has demonstrated for the first time that both blue ring and yellow ring beam abort systems have achieved more than 24 hours hold off time at desired operating voltage. In this paper, we report on the system status and improvements.

[1]  N. Tsoupas,et al.  The RHIC beam abort kicker system , 1999, Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366).

[2]  C.A. Pirrie,et al.  A new gas discharge switch for discharging high energy capacitor banks , 1997, Digest of Technical Papers. 11th IEEE International Pulsed Power Conference (Cat. No.97CH36127).