Production planning problems in printed circuit board assembly
暂无分享,去创建一个
[1] Shailendra Jain,et al. Implementing Setup Optimization on the Shop Floor , 1996, Oper. Res..
[2] Gilbert Laporte,et al. Optimal strip sequencing strategies for flexible manufacturing operations in two and three dimensions , 1992 .
[3] Oded Maimon,et al. Group set-up for printed circuit board assembly , 1989 .
[4] Leon F. McGinnis,et al. AUTOMATED PROCESS PLANNING FOR PRINTED CIRCUIT CARD ASSEMBLY , 1992 .
[5] Mikael Rönnqvist,et al. Optimal Robotic Component Placement , 1996 .
[6] Kathryn E. Stecke,et al. Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems , 1983 .
[7] Yves Crama,et al. Combinatorial optimization models for production scheduling in automated manufacturing systems , 1997 .
[8] Leon F. McGinnis,et al. Routing Printed Circuit Cards Through an Assembly Cell , 1991, Oper. Res..
[9] O. Nevalainen,et al. Optimization of the movements of a component placement machine , 1989 .
[10] Ton G. de Kok,et al. The simultaneous determination of the assignment ofitems to resources, the cycle times, and the reorderintervals in repetitive PCB assembly , 1999, Ann. Oper. Res..
[11] Dennis Johnson,et al. Component Allocation and Partitioning for a Dual Delivery Placement Machine , 1988, Oper. Res..
[12] J. C. AMMONS,et al. Component allocation to balance workload in printed circuit card assembly systems , 1997 .
[13] Rakesh K. Sarin. Perspectives in Operations Management , 1993 .
[14] Kathryn E. Stecke,et al. A study of FMS part type selection approaches for short-term production planning , 1988 .
[15] Kathryn E. Stecke,et al. A synthesis of decision models for tool management in automated manufacturing , 1993 .
[16] Frits C. R. Spieksma,et al. Throughput rate optimization in the automated assembly of printed circuit boards , 1991 .
[17] Pius J. Egbelu,et al. Robotic assembly of printed circuit boards with component feeder location consideration , 1996 .
[18] Manfred Gronalt,et al. Job sequencing and component set-up on a surface mount placement machine , 1998 .
[19] O. E. Flippo,et al. The assembly of printed circuit boards : a case with multiple machines and multiple board types , 1995 .
[20] Charles H. Fine,et al. An Empirical Study of Manufacturing Flexibility in Printed Circuit Board Assembly , 1996, Oper. Res..
[21] Pius J. Egbelu,et al. A dynamic point specification approach to sequencing robot moves for PCB assembly , 1995 .
[22] Horst W. Hamacher,et al. Optimal bin location and sequencing in printed circuit board assembly , 1993 .
[23] J. Bard. A Heuristic for Minimizing the Number of Tool Switches on a Flexible Machine , 1988 .
[24] Frits C. R. Spieksma,et al. The feeder rack assignment problem in PCB assembly: A case study , 2000 .
[25] Reza H. Ahmadi,et al. Design for synchronized flow manufacturing , 1994 .
[26] Reza H. Ahmadi. A Hierarchical Approach to Design, Planning, and Control Problems in Electronic Circuit Card Manufacturing , 1993 .
[27] Arvind Rajan,et al. Using grasp to solve the component grouping problem , 1994 .
[28] John L. Burbidge,et al. The introduction of group technology , 1975 .
[29] Jonathan F. Bard,et al. Facility-Wide Planning and Scheduling of Printed Wiring Board Assembly , 1995, Oper. Res..
[30] Zvi Drezner,et al. On Optimizing Bin Picking and Insertion Plans for Assembly Robots , 1984 .
[31] Arvind Rajan,et al. Assigning components to robotic workcells for electronic assembly , 1989, AT&T Technical Journal.
[32] Frits C. R. Spieksma,et al. The component retrieval problem in printed circuit board assembly , 1995 .
[33] Ronald G. Askin,et al. An Algorithm for NC Turret Punch Press Tool Location and Hit Sequencing , 1984 .
[34] Avraham Shtub,et al. Role of similarity measures in PCB grouping procedures , 1992 .
[35] Panagiotis Kouvelis,et al. Staging Problem of a Dual Delivery Pick-and-Place Machine in Printed Circuit Card Assembly , 1994, Oper. Res..
[36] G. G. Stokes. "J." , 1890, The New Yale Book of Quotations.
[37] Mohan V. Tatikonda,et al. Keeping Pace with Change: International Competition in Printed Circuit Board Assembly , 1995 .
[38] Surendra M. Gupta,et al. SMT FEEDER SLOT ASSIGNMENT FOR PREDETERMINED COMPONENT PLACEMENT PATHS , 1996 .
[39] Frits C. R. Spieksma,et al. Production planning in automated manufacturing , 1994 .
[40] Collin Wang,et al. Heuristics for assembly sequencing and relative magazine assignment for robotic assembly , 1998 .
[41] Stephen Grotzinger. FEEDER ASSIGNMENT MODELS FOR CONCURRENT PLACEMENT MACHINES , 1992 .
[42] Oded Maimon,et al. Set-up saving schemes for printed circuit boards assembly , 1993 .
[43] Alessandro Agnetis,et al. Tool addition strategies for flexible manufacturing systems , 1994 .
[44] Michael O. Ball,et al. Sequencing of Insertions in Printed Circuit Board Assembly , 1988, Oper. Res..
[45] Jonathan F. Bard,et al. Machine setup and component placement in printed circuit board assembly , 1994 .
[46] Wei-Liang Lin,et al. Component Partitioning Under Demand and Capacity Uncertainty in Printed Circuit Board Assembly , 1999 .
[47] Horst W. Hamacher,et al. Finding placement sequences and bin locations for cartesian robots , 1994 .
[48] Margaret L. Brandeau,et al. Optimal Component Assignment and Board Grouping in Printed Circuit Board Manufacturing , 1998, Oper. Res..
[49] François Soumis,et al. Balancing printed circuit board assembly line systems , 1998 .
[50] Moshe Dror,et al. Printed circuit board family grouping and component allocation for a multimachine, open-shop assembly cell , 1994 .
[51] Reza H. Ahmadi,et al. Component Fixture Positioning/Sequencing for Printed Circuit Board Assembly with Concurrent Operations , 1995, Oper. Res..
[52] Brett A. Peters,et al. Replanning and analysis of partial setup strategies in printed circuit board assembly systems , 1996 .
[53] W. H. M. Zijm,et al. Production preparation and numerical control in PCB assembly , 1993 .
[54] Brett A. Peters,et al. A comparison of setup strategies for printed circuit board assembly , 1998 .
[55] Surendra M. Gupta,et al. SIMULTANEOUS COMPONENT SEQUENCING AND FEEDER ASSIGNMENT FOR HIGH SPEED CHIP SHOOTER MACHINES , 1996 .
[56] Leon F. McGinnis,et al. A large scale machine loading problem in flexible assembly , 1985 .
[57] Christopher S. Tang,et al. Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches , 1988, Oper. Res..
[58] Tom M. Cavalier,et al. On locating part bins in a constrained layout area for an automated assembly process , 1990 .
[59] François Vanderbeck,et al. A Tactical Planning Model for Mixed-Model Electronics Assembly Operations , 1999, Oper. Res..
[60] Christopher S. Tang,et al. Models Arising from a Flexible Manufacturing Machine, Part II: Minimization of the Number of Switching Instants , 1988, Oper. Res..
[61] Peter C. Nelson,et al. Optimization of high-mix printed circuit card assembly using genetic algorithms , 1997, Ann. Oper. Res..
[62] Herbert Moskowitz,et al. Optimization of printed circuit board manufacturing: Integrated modeling and algorithms , 2000, Eur. J. Oper. Res..