Scheduling controllable processing time jobs in a deteriorating environment
暂无分享,去创建一个
[1] Ji-Bo Wang,et al. Single-machine scheduling to minimize total absolute differences in waiting times with deteriorating jobs , 2011, J. Oper. Res. Soc..
[2] Dar-Li Yang,et al. A note on due-date assignment and single-machine scheduling with deteriorating jobs , 2008, J. Oper. Res. Soc..
[3] Adam Janiak,et al. Single machine scheduling subject to deadlines and resource dependent processing times , 1996 .
[4] Dar-Li Yang,et al. A note on due-date assignment and single-machine scheduling with deteriorating jobs and learning effects , 2011, J. Oper. Res. Soc..
[5] D. Yang,et al. Scheduling problems with multiple due windows assignment and controllable processing times on a single machine , 2014 .
[6] Jatinder N. D. Gupta,et al. Single facility scheduling with nonlinear processing times , 1988 .
[7] Bertrand M. T. Lin,et al. A concise survey of scheduling with time-dependent processing times , 2004, Eur. J. Oper. Res..
[8] Clyde L. Monma,et al. Convex Resource Allocation Problems on Directed Acyclic Graphs: Duality, Complexity, Special Cases, and Extensions , 1990, Math. Oper. Res..
[9] Sid Browne,et al. Scheduling Deteriorating Jobs on a Single Processor , 1990, Oper. Res..
[10] Dvir Shabtay,et al. Optimization of the machining economics problem for a multistage transfer machine under failure, opportunistic and integrated replacement strategies , 2003 .
[11] Dvir Shabtay,et al. A survey of scheduling with controllable processing times , 2007, Discret. Appl. Math..
[12] Chung-Yee Lee,et al. Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases , 2001, Ann. Oper. Res..
[13] Bahram Alidaee,et al. Two parallel machine sequencing problems involving controllable job processing times , 1993 .
[14] Gur Mosheiov,et al. V-Shaped Policies for Scheduling Deteriorating Jobs , 1991, Oper. Res..
[15] Anand S. Kunnathur,et al. Optimal repayment policies for multiple loans , 1987 .
[16] C. T. Ng,et al. Minimizing Completion Time Variance with Compressible Processing Times , 2005, J. Glob. Optim..
[17] Raymond G. Vickson,et al. Two Single Machine Sequencing Problems Involving Controllable Job Processing Times , 1980 .
[18] Dvir Shabtay,et al. Single and two-resource allocation algorithms for minimizing the maximal lateness in a single machine , 2004, Comput. Oper. Res..
[19] Vitaly A. Strusevich,et al. Single machine scheduling with controllable release and processing parameters , 2006, Discret. Appl. Math..