A TOC-OEE Based Scheme to Improve Productivity
暂无分享,去创建一个
[1] Jeff Cox,et al. The Goal: A Process of Ongoing Improvement , 1984 .
[2] Kanthi M.N. Muthiah,et al. A review of literature on manufacturing systems productivity measurement and improvement , 2006 .
[3] Bernardo Villarreal. The transportation value stream map (TVSM) , 2012 .
[4] Samuel H. Huang,et al. Overall throughput effectiveness (OTE) metric for factory-level performance monitoring and bottleneck detection , 2007 .
[5] Don T. Phillips,et al. Operational efficiency and effectiveness measurement , 2001 .
[6] D. Scott,et al. Can overall factory effectiveness prolong Moore's Law ? , 1998 .
[7] Seiichi Nakajima,et al. Introduction to TPM: total productive maintenance , 1988 .
[8] Bernard Gardner,et al. Overall vehicle effectiveness , 2004 .
[9] Samuel H. Huang,et al. Manufacturing system modeling for productivity improvement , 2002 .
[10] Stephan Niggeschmidt,et al. Calculation and optimisation model for costs and effects of availability relevant service elements , 2006 .
[11] Abdul Raouf,et al. Improving Capital Productivity through Maintenance , 1994 .
[12] Samuel H. Huang,et al. Manufacturing productivity improvement using effectiveness metrics and simulation analysis , 2003 .