Dealing with uncertainty in disassembly line design
暂无分享,去创建一个
Alexandre Dolgui | Olga Battaïa | S. Jack Hu | M. Lounes Bentaha | S. Hu | A. Dolgui | O. Battaïa | M. L. Bentaha
[1] Abe Zeid,et al. Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning , 2014, J. Intell. Manuf..
[2] MengChu Zhou,et al. Disassembly modeling, planning, and application , 2002 .
[3] Alfred J.D. Lambert,et al. Linear programming in disassembly/clustering sequence generation , 1999 .
[4] Matthew Morgan,et al. Disassembly line design with uncertainty , 2005, 2005 IEEE International Conference on Systems, Man and Cybernetics.
[5] Alexandre Dolgui,et al. A Stochastic Formulation of the Disassembly Line Balancing Problem , 2012, APMS.
[6] Manoj Kumar Tiwari,et al. Real world disassembly modeling and sequencing problem: Optimization by Algorithm of Self-Guided Ants (ASGA) , 2009 .
[7] Surendra M. Gupta,et al. Disassembly line in product recovery , 2002 .
[8] P. Dewhurst,et al. Automatic Generation of Product Disassembly Sequences , 1991 .
[9] Can Akkan,et al. Task-failure-driven rebalancing of disassembly lines , 2012 .
[10] M. Degroot,et al. Probability and Statistics , 2021, Examining an Operational Approach to Teaching Probability.
[11] Manoj Kumar Tiwari,et al. A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem , 2008 .
[12] Alexandre Dolgui,et al. Chance Constrained Programming Model for Stochastic Profit-Oriented Disassembly Line Balancing in the Presence of Hazardous Parts , 2013, APMS.
[13] Marco Santochi,et al. Computer Aided Disassembly Planning: State of the Art and Perspectives , 2002 .
[14] Jan Olhager,et al. Advances in Production Management Systems , 2007 .
[15] Dong-Ho Lee,et al. Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal , 2011 .
[16] Yasushi Umeda,et al. Efficiency and feasibility of product disassembly: A case-based study , 2008 .
[17] Ayyuce Aydemir-Karadag,et al. Multi-objective optimization of stochastic disassembly line balancing with station paralleling , 2013, Comput. Ind. Eng..
[18] Askiner Gungor,et al. A solution approach to the disassembly line balancing problem in the presence of task failures , 2001 .
[19] Sami Kara,et al. Selective disassembly sequencing : A methodology for the disassembly of end-of-life products , 2006 .
[20] Turan Paksoy,et al. Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing , 2014 .
[21] Yasushi Umeda,et al. Effects of boundary conditions on the end-of-life treatment of LCD TVs , 2013 .
[22] David P. Morton,et al. Monte Carlo bounding techniques for determining solution quality in stochastic programs , 1999, Oper. Res. Lett..
[23] Ihsan Sabuncuoglu,et al. Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph , 2009 .