Construction and Demolition Waste—A Shift Toward Lean Construction and Building Information Model
暂无分享,去创建一个
[1] G. M. Di Giuda,et al. TECHNICAL SPECIFICATIONS FOR CONSTRUCTION PROCESSES WITH BIM , 2015 .
[2] K.M. Cochran,et al. Estimating construction and demolition debris generation using a materials flow analysis approach. , 2010, Waste management.
[3] Said Jalali,et al. Quantification of construction waste amount , 2007 .
[4] Rafael Sacks,et al. Requirements for building information modeling based lean production management systems for construction , 2010 .
[5] Andrew Fleming,et al. Development of an Experimental Waste Framework Based on Bim/Lean Concept in Construction Design , 2016 .
[6] Xiaoling Zhang,et al. Computational Building Information Modelling for construction waste management: Moving from rhetoric to reality , 2017 .
[7] Xiangjian He,et al. Deconstruction waste management through 3d reconstruction and bim: a case study , 2017 .
[8] Chi Sun Poon,et al. Management of construction waste in public housing projects in Hong Kong , 2004 .
[9] C. M. Tam,et al. Mapping Approach for Examining Waste Management on Construction Sites , 2004 .
[10] A. Björnfot,et al. Application of line‐of‐balance and 4D CAD for lean planning , 2007 .
[11] Zeeshan Aziz,et al. Benefits of visual management in construction: cases from the transportation sector in England , 2017 .
[12] Iris D. Tommelein,et al. PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE , 1999 .
[13] Fritz Gehbauer,et al. Introduction of a Digital Earthwork Construction Site , 2013 .
[14] Ruoyu Jin,et al. Science mapping approach to assisting the review of construction and demolition waste management research published between 2009 and 2018 , 2019, Resources, Conservation and Recycling.
[15] Ash Genaidy,et al. Moving from lean manufacturing to lean construction: Toward a common sociotechnological framework , 2005 .
[16] Robert H. Crawford,et al. Barriers to improving the environmental performance of construction waste management in remote communities , 2017 .
[17] Andrew N. Baldwin,et al. The potential use of BIM to aid construction waste minimalisation , 2011 .
[18] Jaime Solís-Guzmán,et al. A Spanish model for quantification and management of construction waste. , 2009, Waste management.
[19] Lauri Koskela,et al. An exploration towards a production theory and its application to construction , 2000 .
[20] Frank Schultmann,et al. Building Information Modeling (BIM) for existing buildings — Literature review and future needs , 2014 .
[21] Amnon Katz,et al. A novel methodology to estimate the evolution of construction waste in construction sites. , 2011, Waste management.
[22] André Coelho,et al. Distribution of materials in construction and demolition waste in Portugal , 2011, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.
[23] Nicolas Moussiopoulos,et al. A web-based Decision Support System for the optimal management of construction and demolition waste. , 2011, Waste management.
[24] Hongping Yuan,et al. Trend of the research on construction and demolition waste management. , 2011, Waste management.
[25] C S Poon,et al. Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong. , 2009, Waste management.
[26] C Llatas,et al. A model for quantifying construction waste in projects according to the European waste list. , 2011, Waste management.
[27] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .
[28] Lukumon O. Oyedele,et al. Waste minimisation through deconstruction: A BIM based Deconstructability Assessment Score (BIM-DAS) , 2015 .
[29] Peter T. Ward,et al. Lean manufacturing: context, practice bundles, and performance , 2003 .
[30] Rafael Sacks,et al. What constitutes good production flow in construction? , 2016 .
[31] Charles M. Eastman,et al. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .
[32] Yuichi Moriguchi,et al. Where will large amounts of materials accumulated within the economy go?--A material flow analysis of construction minerals for Japan. , 2007, Waste management.
[33] Mark Smithers,et al. Implementing a waste management plan during the construction phase of a project: a case study , 1998 .
[34] Lucio Soibelman,et al. Material Waste in Building Industry: Main Causes and Prevention , 2002 .
[35] Jacob J. Lin,et al. Visual Data and Predictive Analytics for Proactive Project Controls on Construction Sites , 2018, EG-ICE.
[36] Jack C. P. Cheng,et al. A BIM-based system for demolition and renovation waste estimation and planning. , 2013, Waste management.
[37] Ann T. W. Yu,et al. On-site sorting of construction and demolition waste in Hong Kong , 2001 .
[38] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[39] Richard T. Watson,et al. Analyzing the Past to Prepare for the Future: Writing a Literature Review , 2002, MIS Q..
[40] Junaid Qadir,et al. Big data architecture for Construction Waste Analytics (CWA): A conceptual framework , 2016 .
[41] James P. Womack,et al. Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .
[42] Rafael Sacks,et al. Construction flow index: a metric of production flow quality in construction , 2017 .
[43] Frank Schultmann,et al. Deconstruction project planning of existing buildings based on automated acquisition and reconstruction of building information , 2018 .
[44] Taiichi Ohno,et al. Toyota Production System : Beyond Large-Scale Production , 1988 .
[45] M Osmani,et al. Architects' perspectives on construction waste reduction by design. , 2008, Waste management.