Short term planning for cyclic scheduling: A new approach
暂无分享,去创建一个
[1] K. E. Stecke,et al. Procedures to determine part mix ratios for independent demands in flexible manufacturing systems , 1992 .
[2] J. C. Gentina,et al. A heuristic algorithm for the computation of cyclic schedules and the necessary WIP to obtain optimal cycle time , 1994, Proceedings of the Fourth International Conference on Computer Integrated Manufacturing and Automation Technology.
[3] Hervé Camus. Conduite de systèmes flexibles de production manufacturière par composition de régimes permanents cycliques : modélisation et évalution de performances à l'aide des réseaux de Petri , 1997 .
[4] O. Korbaa,et al. Cyclic Productions planning , 2006, The Proceedings of the Multiconference on "Computational Engineering in Systems Applications".
[5] J. C. Gentina,et al. Petri net modeling of ratio-driven flexible manufacturing systems and implications on the WIP for cyclic schedules , 1995, 1995 IEEE International Conference on Systems, Man and Cybernetics. Intelligent Systems for the 21st Century.
[6] Izabela Ewa Nielsen,et al. A cyclic scheduling approach to maintaining production flow robustness , 2018 .
[7] Jean-Marie Proth,et al. Performance evaluation of job-shop systems using timed event-graphs , 1989 .
[8] Kathryn E. Stecke,et al. A study of FMS part type selection approaches for short-term production planning , 1988 .
[9] Harald Ohl. Fonctionnements répétitifs de systèmes flexibles de production manufacturière : analyse et optimisation des performances à l'aide de réseaux de Petri , 1995 .
[10] Kathryn E. Stecke,et al. A flexible approach to part type selection in flexible flow systems using part mix ratios , 1991 .
[11] Jwm Will Bertrand,et al. The finite horizon economic lot sizing problem in job shops: The multiple cycle approach , 2001 .
[12] Stanley B. Gershwin,et al. An algorithm for the computer control of a flexible manufacturing system , 1983 .