The LSST Scheduler from design to construction
暂无分享,去创建一个
[1] Roberto Gilmozzi,et al. Ground-based and Airborne Telescopes VII , 2008 .
[2] Andrew J. Connolly,et al. The LSST metrics analysis framework (MAF) , 2014, Astronomical Telescopes and Instrumentation.
[3] German Schumacher,et al. The LSST OCS scheduler design , 2014, Astronomical Telescopes and Instrumentation.
[4] Francisco Delgado,et al. LSST operation simulator implementation , 2006, SPIE Astronomical Telescopes + Instrumentation.
[5] Michael A. Reuter,et al. Simulating the LSST OCS for conducting survey simulations using the LSST scheduler , 2016, Astronomical Telescopes + Instrumentation.
[6] German Schumacher,et al. LSST communications middleware implementation , 2016, Astronomical Telescopes + Instrumentation.
[7] David Mills,et al. LSST control software component design , 2016, Astronomical Telescopes + Instrumentation.
[8] Andrew J. Connolly,et al. An optical to IR sky brightness model for the LSST , 2016, Astronomical Telescopes + Instrumentation.
[9] German Schumacher,et al. LSST OCS status and plans , 2016, Astronomical Telescopes + Instrumentation.
[10] Abhijit Saha,et al. Advancing the LSST Operations Simulator , 2013 .
[11] Andrew Serio,et al. LSST telescope and site status , 2018, Astronomical Telescopes + Instrumentation.
[12] German Schumacher,et al. The Large Synoptic Survey Telescope OCS and TCS models , 2010, Astronomical Telescopes + Instrumentation.
[13] Abhijit Saha,et al. The LSST operations simulator , 2005, Astronomical Telescopes and Instrumentation.