Using limited data to assess future needs
暂无分享,去创建一个
[1] Ahmad Habibian. Developing and Utilizing Data Bases for Water Main Rehabilitation , 1992 .
[2] I. C. Goulter,et al. Spatial and temporal groupings of water main pipe breakage in Winnipeg , 1988 .
[3] John R. Rossum,et al. PREDICTION OF PITTING RATES IN FERROUS METALS FROM SOIL PARAMETERS , 1969 .
[4] David H. Marks,et al. A new methodology for modelling break failure patterns in deteriorating water distribution systems: Theory , 1987 .
[5] I. Goulter,et al. Predicting Water-Main Breakage Rates , 1993 .
[6] I. C. Goulter,et al. An analysis of pipe breakage in urban water distribution networks , 1985 .
[7] Tuncer B. Edil,et al. Cold Weather Effects on Underground Pipeline Failures , 1983 .
[8] Uri Shamir,et al. An Analytic Approach to Scheduling Pipe Replacement , 1979 .
[9] Ahmad Habibian,et al. Effect of Temperature Changes on Water‐Main Breaks , 1994 .
[10] Raimund Herz. Dégradation et renouvellement des infrastructures [Un modèle de survie par cohorte] , 1996 .
[11] Thomas M. Walski,et al. Economic analysis of water main breaks , 1982 .
[12] Thomas M. Walski. Replacement Rules for Water Mains , 1987 .
[13] R. M. Clark,et al. Developing a Data Base on Infrastructure Needs , 1989 .
[14] Robert E. Melchers,et al. RELIABILITY OF UNDERGROUND PIPELINES SUBJECT TO CORROSION , 1994 .
[15] Barry J. Adams,et al. LONG-TERM PLANNING METHODOLOGY FOR WATER DISTRIBUTION SYSTEM REHABILITATION , 1998 .