Points deserving attention in controlled blasting of road trench

Taken excavation engineering of auxiliary road in YK10+040~YK11+060 section of Wenzhou airport as example and combined with practical situations of construction site,from four aspects: establishment of organization institution and operation flow,execution of safety guard scheme,protective barrier and traffic organization design matters deserving attention in controlled blasting construction of road trench are elaborated.Practice receives good effect.