An adaptive agile manufacturing control infrastructure based on TOPNs-CS modelling
暂无分享,去创建一个
[1] Rolf Isermann,et al. Adaptive control systems , 1991 .
[2] Jc Johan Wortmann,et al. Customer-driven manufacturing , 1996 .
[3] Peter B. Luh,et al. Holonic manufacturing scheduling: architecture, cooperation mechanism and implementation , 1998 .
[4] Jie Zhang,et al. Object-oriented modeling of control system for agile manufacturing cells , 1999 .
[5] Bin Wu. Manufacturing Systems Design and Analysis , 1991 .
[6] Judea Pearl,et al. Heuristics : intelligent search strategies for computer problem solving , 1984 .
[7] Hendrik Van Brussel,et al. Schedule execution using perturbation analysis , 1998, Proceedings. 1998 IEEE International Conference on Robotics and Automation (Cat. No.98CH36146).
[8] Frank DiCesare,et al. Scheduling flexible manufacturing systems using Petri nets and heuristic search , 1994, IEEE Trans. Robotics Autom..
[9] Yiliu Tu. Automatic scheduling and control of a ship web welding assembly line , 1996 .
[10] Zhibin Jiang,et al. Object-Oriented Petri Nets with Changeable Structure (OPNs-CS) for Production System Modelling , 1999 .
[11] Z. Jiang,et al. Performance Modelling of Complex Dynamic Production Systems Using Temporised Object-Oriented Petri Nets with Changeable Structure (TOPNs-CS) , 2000 .
[12] Luc Bongaerts,et al. Reference architecture for holonic manufacturing systems: PROSA , 1998 .
[13] Yiliu Tu,et al. Adaptive Scheduling and Control of One-of-a-Kind Production , 1997 .