Validating the Adaptability of Travel Time Reliability Measurements using Probe Data

Travel time reliability (TTR) is considered a critical piece of information in highway performance evaluation. The L02 project from Strategic Highway Research Program 2 (SHRP2) has developed a holistic method using statistical probability functions of travel time as the TTR measure to build highway performance evaluation and monitoring systems. Compared with single-value reliability measures, the L02 measure is able to identify sources of unreliability and quantify their associated impacts. To validate the adaptability of L02 measure, TTR analysis on the I-15 freeway corridor in Salt Lake City, Utah using probe data has been conducted. The result is compared against output from the quadrant-based TTR measure that is currently used by the Utah Department of Transportation. Through cross-validation, it is determined that the two suites of measures demonstrate good consistency in relation to reliability assessment and unreliability source diagnoses. In addition, the study provides a method to calibrate the quadrant-based TTR measure, and new critical values were developed based on the cross-validation.

[1]  David Watling,et al.  A statistical method for estimating predictable differences between daily traffic flow profiles , 2017 .

[2]  Huizhao Tu,et al.  Travel time unreliability on freeways: Why measures based on variance tell only half the story , 2008 .

[3]  Orazio Giuffrè,et al.  Speed Stochastic Processes and Freeway Reliability Estimation: Evidence from the A22 Freeway, Italy , 2013 .

[4]  Richard Margiotta,et al.  Incorporating travel time reliability into the Highway Capacity Manual. , 2014 .

[5]  Robert Edelstein,et al.  Pilot Testing of SHRP 2 Reliability Data and Analytical Products: Florida , 2014 .

[6]  Rob Hranac,et al.  Relating Travel Time Reliability and Nonrecurrent Congestion with Multistate Models , 2012 .

[7]  Patricio Alvarez,et al.  Time-Variant Travel Time Distributions and Reliability Metrics and Their Utility in Reliability Assessments , 2012 .

[8]  Rich Margiotta,et al.  Incorporating Reliability Performance Measures into the Transportation Planning and Programming Processes: Technical Reference , 2014 .

[9]  윤태영,et al.  Transportation Research Board of the National Academies , 2015 .

[10]  Paul Morris,et al.  Pilot Testing of SHRP 2 Reliability Data and Analytical Products: Minnesota , 2015 .

[11]  Kyriacos C. Mouskos,et al.  Analysis of Travel Time Reliability in New York City Based on Day-of-Week and Time-of-Day Periods , 2012 .

[12]  Neila Bhouri,et al.  Managing Highways for Better Reliability , 2011 .

[13]  Camille Kamga,et al.  Temporal and weather related variation patterns of urban travel time: Considerations and caveats for value of travel time, value of variability, and mode choice studies , 2014 .

[14]  Henry X. Liu,et al.  Estimation of the Time-dependency of Values of Travel Time and Its Reliability from Loop Detector Data , 2007 .

[15]  Graham Currie,et al.  Causes of travel time unreliability: a Melbourne case study , 2008 .

[16]  Paul Morris,et al.  Pilot Testing of SHRP 2 Reliability Data and Analytical Products: Minnesota [supporting datasets] , 2014 .

[17]  Yinhai Wang,et al.  Pilot testing of SHRP 2 reliability data and analytical products: Washington. [supporting datasets] , 2014 .

[18]  Yao-Jan Wu,et al.  Mixture Models for Fitting Freeway Travel Time Distributions and Measuring Travel Time Reliability , 2016 .

[19]  Qing He,et al.  Estimating freeway route travel time distributions with consideration to time-of-day, inclement weather, and traffic incidents , 2016 .

[20]  Wenjing Pu Analytic Relationships between Travel Time Reliability Measures , 2011 .

[21]  Guangquan Lu,et al.  A travel time reliability model of urban expressways with varying levels of service , 2014 .

[22]  M. Fosgerau,et al.  Valuing travel time variability: Characteristics of the travel time distribution on an urban road , 2012 .

[23]  Doohee Nam,et al.  Estimation of Value of Travel Time Reliability , 2005 .

[24]  Alexandre M. Bayen,et al.  Trade-offs Between Inductive Loops and GPS Probe Vehicles for Travel Time Estimation: Mobile Century Case Study , 2012 .

[25]  Adam J. Pel,et al.  Travel Time Reliability during Evacuation: Impact of Heterogeneous Driving Behavior , 2012 .

[26]  Eric Horvitz,et al.  Predicting Travel Time Reliability using Mobile Phone GPS Data , 2017 .

[27]  Yinhai Wang,et al.  Pilot Testing of SHRP 2 Reliability Data and Analytical Products: Washington , 2014 .

[28]  Rob Hranac,et al.  Decomposition of Travel Time Reliability into Various Sources , 2011 .

[29]  Zhuo Chen,et al.  Non-recurrent congestion analysis using data-driven spatiotemporal approach for information construction , 2016 .

[30]  Hao Li,et al.  Macroscopic Travel Time Reliability Diagrams for Freeway Networks , 2013 .

[31]  Xiaoyue Cathy Liu,et al.  Data-Driven Freeway Performance Evaluation Framework for Project Prioritization and Decision Making , 2015 .