Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times
暂无分享,去创建一个
[1] Lixin Tang,et al. A mathematical programming model for scheduling steelmaking-continuous casting production , 2000, Eur. J. Oper. Res..
[2] R. Gomory,et al. Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem , 1964 .
[3] Jatinder N. D. Gupta,et al. A review of scheduling research involving setup considerations , 1999 .
[4] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[5] Maw-Sheng Chern,et al. Two-machine flowshop group scheduling problem , 2000, Computers & Operations Research.
[6] Chris N. Potts,et al. Scheduling with batching: A review , 2000, Eur. J. Oper. Res..
[7] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[8] Charles R. Standridge,et al. Modeling and Analysis of Manufacturing Systems , 1993 .
[9] Ferda Can Çetinkaya,et al. Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated , 1994 .
[10] Christos H. Papadimitriou,et al. Flowshop scheduling with limited temporary storage , 1980, JACM.
[11] R. G. Vickson,et al. Two- and three-machine flow shop scheduling problems with equal sized transfer batches , 1992 .
[12] Dileep R. Sule,et al. Sequencing n jobs on two machines with setup, processing and removal times separated , 1982 .
[13] D. A. Wismer,et al. Solution of the Flowshop-Scheduling Problem with No Intermediate Queues , 1972, Oper. Res..
[14] K. R Baker,et al. Scheduling groups of jobs in the two-machine flow shop , 1990 .
[15] Jürgen Dorn,et al. Scheduling High-Grade Steelmaking , 1996, IEEE Expert.
[16] Katsundo Hitomi,et al. Optimal Two-Stage Production Scheduling with Setup Times Separated , 1979 .
[17] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..
[18] C. Sriskandarajah,et al. Two-machine group scheduling problem with blocking and anticipatory setups , 1993 .
[19] Alessandro Agnetis,et al. Batch Scheduling in a Two-machine Flow Shop with Limited Buffer , 1997, Discret. Appl. Math..
[20] R E Gomory,et al. A SOLVABLE CASE OF THE TRAVELING SALESMAN PROBLEM. , 1964, Proceedings of the National Academy of Sciences of the United States of America.