ASPEN dynamics simulation for combined cycle power plant – Validation with hot start-up measurement

Abstract Since the beginning of energy market liberalization, shutdown and start-up phases of thermal power plants have acquired greater importance. Dynamic simulation is a helpful tool due to its possibility of predicting the behaviour of the power plant with a good degree of accuracy. This paper goes into the details of the hot start-up phase of a combined cycle power plant with three-pressure level heat recovery steam generator, analysing the capability of the software ASPEN Plus Dynamic through a dynamic comparison between the numerical results and the real operation data. The developed model is built according to the design data of an actual plant including heat exchangers, pipes, turbines, valves, pumps and so on. Good agreements between measurement and simulation results, with some discrepancies in the first phase of the start-up, have been found and then discussed. Best deviation values are obtained for the temperature where the maximum relative error is 3.62% in the re-heater section. Worst deviation values are obtained for the pressure where the maximum relative error shown is 10.8%. Further possible improvements of the model and future applications are suggested.

[1]  W. Luyben Distillation Design and Control Using Aspen Simulation , 2006 .

[2]  G. Recktenwald Finite-Difference Approximations to the Heat Equation , 2004 .

[3]  Stefano Bracco,et al.  Dynamic simulation of combined cycle power plant cycling in the electricity market , 2016 .

[4]  Bernd Epple,et al.  Dynamic simulation of a triple-pressure combined-cycle plant: Hot start-up and shutdown , 2016 .

[5]  Zheng Li,et al.  A mixed-integer nonlinear programming approach to the optimal design of heat network in a polygeneration energy system , 2014 .

[6]  Rong Wang,et al.  Analysis of Membrane Distillation Crystallization System for High Salinity Brine Treatment with Zero Discharge Using Aspen Flowsheet Simulation , 2012 .

[7]  Bernd Epple,et al.  A comparative study of different dynamic process simulation codes for combined cycle power plants – Part B: Start-up procedure , 2015 .

[8]  Kihyung Kim,et al.  Gas Turbine Combined Cycle Dynamic Simulation: A Physics Based Simple Approach , 2013 .

[9]  R. Kehlhofer,et al.  Combined-cycle gas and steam turbine power plants. 2. edition , 1991 .

[10]  Sergio Mussati,et al.  A discrete and continuous mathematical model for the optimal synthesis and design of dual pressure heat recovery steam generators coupled to two steam turbines , 2016 .

[11]  Stefano Consonni,et al.  Numerical optimization of steam cycles and steam generators designs for coal to FT plants , 2013 .

[12]  Bernd Epple,et al.  Fast start-up analyses for Benson heat recovery steam generator , 2012 .

[13]  Ali Ghaffari,et al.  Thermodynamic modeling based optimization for thermal systems in heat recovery steam generator during cold start-up operation , 2014 .

[14]  Jamal Chaouki,et al.  Simulation of circulating fluidized bed reactors using ASPEN PLUS , 1998 .

[15]  Lawrence Megan,et al.  Compartmental modeling of high purity air separation columns , 2005, Comput. Chem. Eng..

[16]  Michael Tiller,et al.  Introduction to Physical Modeling with Modelica , 2001 .

[17]  Peter A. Fritzson,et al.  Principles of object-oriented modeling and simulation with Modelica 2.1 , 2004 .

[18]  T. Kreutz,et al.  Heat integration and heat recovery steam cycle optimization for a low-carbon lignite/biomass-to-jet fuel demonstration project , 2019, Applied Energy.

[19]  Christodoulos A. Floudas,et al.  APROS: Algorithmic Development Methodology for Discrete-Continuous Optimization Problems , 1989, Oper. Res..

[20]  Alberto Mirandola,et al.  Dynamic behaviour analysis of a three pressure level heat recovery steam generator during transient operation , 2015 .

[21]  S. C. Gülen Gas Turbines for Electric Power Generation , 2019 .

[22]  Hans Olsson,et al.  Dymola for Multi-Engineering Modeling and Simulation , 2002 .

[23]  Francesco Casella,et al.  Fast Start-up of a Combined-Cycle Power Plant: a Simulation Study with Modelica , 2006 .

[24]  Olav Bolland,et al.  Design criteria and optimization of heat recovery steam cycles for integrated reforming combined cycles with CO2 capture , 2012 .

[25]  Bernd Epple,et al.  Numerical and experimental study of a heat recovery steam generator during start-up procedure , 2014 .

[26]  Karl M. Broer,et al.  Gasification , 2019, Thermochemical Processing of Biomass.

[27]  Stefano Consonni,et al.  Shell coal IGCCS with carbon capture: Conventional gas quench vs. innovative configurations , 2011 .

[28]  Cristina Elsido,et al.  MINLP model and two-stage algorithm for the simultaneous synthesis of heat exchanger networks, utility systems and heat recovery cycles , 2017, Comput. Chem. Eng..

[29]  Bernd Epple,et al.  Progress in dynamic simulation of thermal power plants , 2017 .

[30]  Bernd Epple,et al.  A comparative study of different dynamic process simulation codes for combined cycle power plants – Part A: Part loads and off-design operation , 2015 .

[31]  Jeeyoung Shin,et al.  Analysis of the dynamic characteristics of a combined-cycle power plant , 2002 .