Using metaheuristic and fuzzy system for the optimization of material pull in a push-pull flow logistics network

Alternative material flow strategies in logistics networks have crucial influences on the overall performance of the networks. Material flows can follow push, pull, or hybrid systems. To get the advantages of both push and pull flows in networks, the decoupling-point strategy is used as coordination mean. At this point, material pull has to get optimized concerning customer orders against pushed replenishment-rates. To compensate the ambiguity and uncertainty of both dynamic flows, fuzzy set theory can practically be applied. This paper has conceptual and mathematical parts to explain the performance of the push-pull flow strategy in a supply network and to give a novel solution for optimizing the pull side employing Conwip system. Alternative numbers of pallets and their lot-sizes circulating in the assembly system are getting optimized in accordance with a multi-objective problem; employing a hybrid approach out of meta-heuristics (genetic algorithm and simulated annealing) and fuzzy system. Two main fuzzy sets as triangular and trapezoidal are applied in this technique for estimating ill-defined waiting times. The configured technique leads to smoother flows between push and pull sides in complex networks. A discrete-event simulation model is developed to analyze this thesis in an exemplary logistics network with dynamics.

[1]  Bo K. Wong,et al.  A survey of the application of fuzzy set theory in production and operations management: 1998-2009 , 2011 .

[2]  Gareth Stone,et al.  Making build to order a reality: the 5 day car initiative , 2011 .

[3]  Rajan Suri,et al.  Quick Response Manufacturing , 1998 .

[4]  Jasbir S. Arora,et al.  Survey of multi-objective optimization methods for engineering , 2004 .

[5]  Sanja Petrovic,et al.  A Fuzzy Genetic Algorithm for Real-World Job Shop Scheduling , 2005, IEA/AIE.

[6]  Erick Cantú-Paz,et al.  Migration Policies, Selection Pressure, and Parallel Evolutionary Algorithms , 2001, J. Heuristics.

[7]  Bernd Scholz-Reiter,et al.  Autonomously controlled production systems—Influence of autonomous control level on logistic performance , 2009 .

[8]  Antonio Rizzi,et al.  A fuzzy logic based methodology to rank shop floor dispatching rules , 2002 .

[9]  Bernd Scholz-Reiter,et al.  Autonomous Processes in Assembly Systems , 2007 .

[10]  Ayaho Miyamoto,et al.  Fuzzy concrete bridge deck condition rating method for practical bridge management system , 2009, Expert Syst. Appl..

[11]  Abraham Grosfeld-Nir,et al.  A simulation study of pull systems with ascending/descending buffers and stochastic processing times , 2005 .

[12]  Bernd Scholz-Reiter,et al.  Superior Performance of Leagile Supply Networks by Application of Autonomous Control , 2009, APMS.

[13]  Ponnuthurai N. Suganthan,et al.  Multi-objective evolutionary algorithms based on the summation of normalized objectives and diversified selection , 2010, Inf. Sci..

[14]  Thomas Weise,et al.  Global Optimization Algorithms -- Theory and Application , 2009 .

[15]  小澤 輝智,et al.  Institutions, industrial upgrading, and economic performance in Japan : the 'flying-geese' paradigm of catch-up growth , 2005 .

[16]  Gyanendra Kumar Goyal,et al.  Development of Intelligent Computing Expert System Models for Shelf Life Prediction of Soft Mouth Melting Milk Cakes , 2011 .

[17]  Shyi-Ming Chen,et al.  Fuzzy risk analysis based on ranking generalized fuzzy numbers with different heights and different spreads , 2009, Expert Syst. Appl..

[18]  王坚强,et al.  Aggregation operators on intuitionistic trapezoidal fuzzy number and its application to multi-criteria decision making problems , 2009 .

[19]  Thierry-Marie Guerra,et al.  Application of practical fuzzy arithmetic to fuzzy internal model control , 2011, Eng. Appl. Artif. Intell..

[20]  Shiwei He,et al.  Robust Optimization Model and Algorithm for Logistics Center Location and Allocation under Uncertain Environment , 2009 .

[21]  Sanja Petrovic,et al.  Fuzzy job shop scheduling with lot-sizing , 2008, Ann. Oper. Res..

[22]  Saeed Zolfaghari,et al.  Cellular manufacturing versus a hybrid system: a comparative study , 2006 .

[23]  Jan Riezebos,et al.  Workload balancing capability of pull systems in MTO production , 2010 .

[24]  Karl G. Kempf An Overview of Decision Policies for Production Networks , 2012 .

[25]  W. Klingenberg,et al.  A conceptual framework for outsourcing of materials handling activities in automotive: differentiation and implementation , 2010 .

[26]  Paul Schönsleben,et al.  With agility and adequate partnership strategies towards effective logistics networks , 2000 .

[27]  Ping Ji,et al.  Positioning multiple decoupling points in a supply network , 2008 .

[28]  David L. Woodruff,et al.  Production planning with load dependent lead times , 2005, 4OR.

[29]  B Scholz-Reiter,et al.  Handling Dynamics in Logistics - Adoption of Dynamic Behaviour and Reduction of Dynamic Effects , 2009 .

[30]  Ronald G. Askin,et al.  Defining inventory control points in multiproduct stochastic pull systems , 2009 .

[31]  J. Tien Manufacturing and services: From mass production to mass customization , 2011 .

[32]  A. Gunasekaran,et al.  A framework for supply chain performance measurement , 2004 .

[33]  Felix T.S. Chan Effect of kanban size on just-in-time manufacturing systems , 2001 .

[34]  Andy J. Keane,et al.  Meta-Lamarckian learning in memetic algorithms , 2004, IEEE Transactions on Evolutionary Computation.

[35]  Mostafa Zandieh,et al.  An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness , 2009, Expert Syst. Appl..

[36]  David L. Woodruff,et al.  CONWIP: a pull alternative to kanban , 1990 .

[37]  V. Sridharan,et al.  Linking manufacturing planning and control to the manufacturing environment , 1995 .

[38]  J. Boylan,et al.  Forecasting for Items with Intermittent Demand , 1996 .

[39]  Ali Yalcin,et al.  An object-oriented simulation framework for real-time control of automated flexible manufacturing systems , 2005, Comput. Ind. Eng..

[40]  Christoph Karrer Engineering Production Control Strategies , 2012 .

[41]  Klaus-Dieter Thoben,et al.  Application of learning pallets for real-time scheduling by the use of radial basis function network , 2013, Neurocomputing.

[42]  Bernd Scholz-Reiter,et al.  Toward learning autonomous pallets by using fuzzy rules, applied in a Conwip system , 2012, The International Journal of Advanced Manufacturing Technology.

[43]  Cathal Heavey,et al.  A comparison of Hybrid Push/Pull and CONWIP/Pull production inventory control policies , 2004 .

[44]  Charu Chandra,et al.  Managing multi‐item common vendor inventory system with random demands , 2002 .

[45]  Jan Holmström,et al.  Implementing Collaboration Process Networks , 2002 .

[46]  D. Towill,et al.  Engineering the leagile supply chain , 2000 .

[47]  Addition of Two Generalized Fuzzy NumbersD , 2022 .

[48]  N. Ravi Shankar,et al.  Ranking Fuzzy Numbers with a Distance Method using Circumcenter of Centroids and an Index of Modality , 2011, Adv. Fuzzy Syst..

[49]  Toshio Fukuda,et al.  Structured intelligence for self-organizing manufacturing systems , 1999, J. Intell. Manuf..

[50]  Jörn Schönberger Operational Freight Carrier Planning: Basic Concepts, Optimization Models and Advanced Memetic Algorithms , 2005 .

[51]  Masatoshi Sakawa,et al.  Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms , 2000, Eur. J. Oper. Res..

[52]  Nuno O. Fernandes,et al.  Generic POLCA : a production and materials flow control mechanism for quick response manufacturing , 2006 .

[53]  Bernd Scholz-Reiter,et al.  Towards learning pallets applied in pull control job-open shop problem , 2011, 2011 IEEE International Symposium on Assembly and Manufacturing (ISAM).

[54]  N. Ravi Shankar,et al.  Ordering Generalized Trapezoidal Fuzzy Numbers Using Orthocentre of Centroids , 2012 .