The Impact Made on Project Portfolio Optimisation by the Selection of Various Risk Measures

In this study, the effect of selecting an appropriate risk measure and the impact of this choice on the efficient frontier of the organization’s project portfolio, has been studied. Proper choice of firm’s project portfolio has a great impact on organizational success. Each portfolio manager selects the best projects with different criteria, and consistent with firm’s strategic objectives. We have selected the best projects of the organization, using Markowitz efficient frontier method.  The choice of proper measures is influential in making this decision and can change the organization’s portfolio. For doing this, the standard deviation is applied and the relevant optimization have been done. Then, in order to differentiate favorable and unfavorable opportunities, semi-standard deviation has also been applied. Afterwards, Value at Risk and Expected Shortfall are applied as the appropriate risk measures, to have a better estimate of the tail risks. With all of these risk measures the best possible projects were selected. Managers should select the appropriate risk measures according to their objectives, estimation of their projects’ distribution, and characteristic of the projects. In this research, the best measures consistent with construction projects and the effect of changes in these measures have been studied.DOI: http://dx.doi.org/10.5755/j01.ee.29.2.17405

[1]  Pierre-Alexandre Château,et al.  Risk assessment by integrating interpretive structural modeling and Bayesian network, case of offshore pipeline project , 2015, Reliab. Eng. Syst. Saf..

[2]  Thorsten Rheinländer Risk Management: Value at Risk and Beyond , 2003 .

[3]  Riccardo Cesari,et al.  Benchmarking, portfolio insurance and technical analysis: a Monte Carlo comparison of dynamic strategies of asset allocation , 2003 .

[4]  Yao Zhang Selecting risk response strategies considering project risk interdependence , 2016 .

[5]  Pan Zhao,et al.  Portfolio selection problem with Value-at-Risk constraints under non-extensive statistical mechanics , 2016, J. Comput. Appl. Math..

[6]  Suleyman Basak,et al.  Value-at-Risk Based Risk Management: Optimal Policies and Asset Prices , 1999 .

[7]  Luis Ortiz-Gracia,et al.  Efficient VaR and Expected Shortfall computations for nonlinear portfolios within the delta-gamma approach , 2014, Appl. Math. Comput..

[8]  Karen L. Becker,et al.  Workforce-related risks in projects with a contingent workforce , 2015 .

[9]  Tom Gilb,et al.  9.1.5 Risk Management: A practical toolkit for identifying, analyzing and coping with project risks , 2002 .

[10]  Yazid M. Sharaiha,et al.  Heuristics for cardinality constrained portfolio optimisation , 2000, Comput. Oper. Res..

[11]  J. Paquin,et al.  The downside risk of project portfolios: The impact of capital investment projects and the value of project efficiency and project risk management programmes , 2016 .

[12]  Laura Spierdijk,et al.  Confidence Intervals for ARMA-GARCH Value-at-Risk: The Case of Heavy Tails and Skewness , 2013, Comput. Stat. Data Anal..

[13]  S. M. Kinsella Activity-Based Costing: Does it Warrant Inclusion in a Guide to the Project Management Body of Knowledge (PMBOK® Guide)? , 2002 .

[14]  Stavros Degiannakis,et al.  Multiple-Days-Ahead Value-At-Risk and Expected Shortfall Forecasting for Stock Indices, Commodities and Exchange Rates: Inter-Day Versus Intra-Day Data , 2016 .

[15]  Dejun Xie,et al.  Value-at-Risk estimation with stochastic interest rate models for option-bond portfolios , 2017 .

[16]  N. Chan,et al.  Artifactual unit root behavior of Value at risk (VaR) , 2016 .

[17]  Steve L. Allen Financial Risk Management: A Practitioner's Guide to Managing Market and Credit Risk , 2003 .

[18]  Denis José Schiozer,et al.  Uncertainty and Risk Analysis in Petroleum Exploration and Production , 2009 .

[19]  M. Righi,et al.  A Comparison of Expected Shortfall Estimation Models , 2014 .

[20]  Philippe Artzner,et al.  Coherent Measures of Risk , 1999 .

[21]  A. Hacura,et al.  Risk analysis in investment appraisal based on the Monte Carlo simulation technique , 2001 .

[22]  Tak Kuen Siu,et al.  Optimal portfolios with maximum Value-at-Risk constraint under a hidden Markovian regime-switching model , 2016, Autom..

[23]  Zhiyi Lu,et al.  Optimal reinsurance under VaR and TVaR risk measures in the presence of reinsurer’s risk limit , 2016 .

[24]  Glyn A. Holton Value at Risk: Theory and Practice , 2003 .

[25]  Michel Denault,et al.  Dynamic portfolio choices by simulation-and-regression: Revisiting the issue of value function vs portfolio weight recursions , 2015, Comput. Oper. Res..

[26]  José Manuel Galán,et al.  Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques , 2015 .

[27]  Kevin Dowd,et al.  Beyond Value at Risk: The New Science of Risk Management , 1998 .

[28]  Chueh-Yung Tsao Portfolio selection based on the mean–VaR efficient frontier , 2010 .

[29]  Robert L. K. Tiong,et al.  NPV-at-Risk Method in Infrastructure Project Investment Evaluation , 2000 .

[30]  Daniel Rösch,et al.  Quantifying market risk with Value-at-Risk or Expected Shortfall? – Consequences for capital requirements and model risk , 2016 .

[31]  Cornelis W. Oosterlee,et al.  Multi-period mean–variance portfolio optimization based on Monte-Carlo simulation , 2016 .

[32]  Chuan-Sheng Wang,et al.  Conditional Value-at-Risk: Semiparametric estimation and inference , 2016 .

[33]  Y. Chen,et al.  Influence of personality and risk propensity on risk perception of Chinese construction project managers , 2016 .

[34]  Ramiro Concepción,et al.  An intuitionistic method for the selection of a risk management approach to information technology projects , 2017, Inf. Sci..

[35]  T. Vorst Optimal Portfolios under a Value at Risk Constraint , 2001 .

[36]  K. Lai,et al.  Multiscale dependence analysis and portfolio risk modeling for precious metal markets , 2016 .

[37]  Axel Buchner Equilibrium option pricing: A Monte Carlo approach , 2015 .

[38]  Wenyan Song,et al.  Risk assessment of co-creating value with customers: A rough group analytic network process approach , 2016, Expert Syst. Appl..

[39]  Yan Gao,et al.  Portfolio selection based on a benchmark process with dynamic value-at-risk constraints , 2017, J. Comput. Appl. Math..

[40]  Feng Jin,et al.  Improving risk assessment in financial feasibility of international engineering projects: A risk driver perspective , 2017 .

[41]  Masoud Zare Naghadehi,et al.  The probabilistic time and cost risk analysis of a challenging part of an urban tunneling project , 2016 .

[42]  Sangyeol Lee,et al.  Nonlinear expectile regression with application to Value-at-Risk and expected shortfall estimation , 2016, Comput. Stat. Data Anal..

[43]  Kenneth H. Rose A Guide to the Project Management Body of Knowledge (PMBOK® Guide)—Fifth Edition , 2013 .

[44]  J. Sadefo Kamdem,et al.  Fuzzy value-at-risk and expected shortfall for portfolios with heavy-tailed returns , 2014 .

[45]  Rubén Saborido,et al.  Evolutionary multi-objective optimization algorithms for fuzzy portfolio selection , 2016, Appl. Soft Comput..

[46]  Qian Chen,et al.  Computational Statistics and Data Analysis Bayesian Value-at-risk and Expected Shortfall Forecasting via the Asymmetric Laplace Distribution , 2022 .

[47]  D. Duffie,et al.  An Overview of Value at Risk , 1997 .

[48]  C. Lucas,et al.  Heuristic algorithms for the cardinality constrained efficient frontier , 2011, Eur. J. Oper. Res..

[49]  Raquel Balbás,et al.  VaR as the CVaR sensitivity: Applications in risk optimization , 2017, J. Comput. Appl. Math..

[50]  Francisco Ortega,et al.  A method for the evaluation of risk in IT projects , 2016, Expert Syst. Appl..

[51]  Philippe Jorion,et al.  Financial Risk Manager Handbook , 2003 .

[52]  Vahidreza Yousefi,et al.  Proposing a neural network model to predict time and cost claims in construction projects , 2016 .

[53]  Bong-Gyu Jang,et al.  Ambiguity and Optimal Portfolio Choice with Value-at-Risk Constraint , 2015 .

[54]  Konstantinos Liagkouras,et al.  A new Probe Guided Mutation operator and its application for solving the cardinality constrained portfolio optimization problem , 2014, Expert Syst. Appl..

[55]  A. Medaglia,et al.  Linear solution schemes for Mean-SemiVariance Project portfolio selection problems: An application in the oil and gas industry , 2017 .

[56]  Elena Dumitrescu,et al.  Which are the SIFIs? A Component Expected Shortfall (CES) Approach to Systemic Risk , 2012 .

[57]  Philippe Jorion,et al.  Risk Management Lessons from Long-Term Capital Management , 1999 .

[58]  Kash Barker,et al.  Quantifying the risk of project delays with a genetic algorithm , 2015 .

[59]  Chang-Biau Yang,et al.  Multiperiod portfolio investment using stochastic programming with conditional value at risk , 2017, Comput. Oper. Res..

[60]  W. Kürsten,et al.  Decision making with Expected Shortfall and spectral risk measures: The problem of comparative risk aversion , 2015 .

[61]  Adolfo López-Paredes,et al.  An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index , 2011 .

[62]  Kamran Rezaie,et al.  Using extended Monte Carlo simulation method for the improvement of risk management: Consideration of relationships between uncertainties , 2007, Appl. Math. Comput..