A competitive progression perspective of JIT systems: evidence from early US implementations

This study investigates the holistic implementation of just-in-time (JIT) manufacturing. We contend that the most important elements of holistic JIT systems – focused factory, reduced setup times, group technology, total productive maintenance, multifunction employees, uniform workload, just-in-time purchasing, Kanban, total quality control and quality circles – should be implemented in a sequential manner for a firm to reap sustainable operational gains. The right sequence of implementation of JIT practices is derived using the theory of competitive progression and based on four JIT practice bundles – conformance quality related practices, delivery reliability related practices, volume flexibility related practices and low cost related practices. Data collected in a cross-sectional field study of US manufacturers are used to test the suggested implementation sequence of JIT practices and the impact of the JIT practice bundles on improvement in non-value added performance. The results indicate that implementations of JIT management practices should be in the order – first, conformance quality related practices; second, delivery reliability related practices; third, volume flexibility related practices and; finally low cost related practices. In addition, significant improvement in operational performance, as reflected in improvement of non-value added performance, is achieved via the cumulative capability building.

[1]  J. Nunnally Psychometric Theory (2nd ed), New York: McGraw-Hill. , 1978 .

[2]  新郷 重夫,et al.  A study of the Toyota production system from an industrial engineering viewpoint , 1989 .

[3]  Y. Monden Toyota Production System: Practical Approach to Production Management , 1983 .

[4]  門田 安弘,et al.  Toyota production system : practical approach to production management , 1983 .

[5]  Mehran Sepehri Quality Control Circles: A Vehicle for Just-in-Time Implementation. , 1985 .

[6]  James F. Cox,et al.  An examination of just-in-time management for the small manufacturer: with an illustration , 1986 .

[7]  Richard Schonberger,et al.  World class manufacturing : the lessons of simplicity applied , 1986 .

[8]  John G. Wacker,et al.  The complementary nature of manufacturing goals by their relationship to throughput time: A theory of internal variability of production systems , 1987 .

[9]  Paul M. Swamidass,et al.  Manufacturing strategy, environmental uncertainty and performance: a path analytic model , 1987 .

[10]  James C. Anderson,et al.  STRUCTURAL EQUATION MODELING IN PRACTICE: A REVIEW AND RECOMMENDED TWO-STEP APPROACH , 1988 .

[11]  Jeffrey Miller,et al.  Flexibility: The Next Competitive Battle: The Manufacturing Futures Survey , 1989 .

[12]  Suzanne Berger,et al.  Toward a New Industrial America. , 1989 .

[13]  James P. Gilbert,et al.  The state of JIT implementation and development in the USA , 1990 .

[14]  A. Meyer,et al.  Lasting Improvements in Manufacturing Performance: In Search of a New Theory , 1990 .

[15]  Marilyn M. Helms,et al.  Meeting the Human Resource Challenges of JIT through Management Development , 1990 .

[16]  Nazim U. Ahmed,et al.  A comparative study of US manufacturing firms at various stages of just-in-time implementation , 1991 .

[17]  J A Davy,et al.  A derivation of the underlying constructs of just-in-time management systems. , 1992, Academy of Management journal. Academy of Management.

[18]  Graham K. Rand,et al.  Just-in-Time Manufacturing in Perspective , 1993 .

[19]  R. Anthony Inman,et al.  The Impact of Quality Circles on JIT Implementation , 1993 .

[20]  Mark N. Frolick,et al.  A comparative analysis and review of JIT “implementation” research , 1995 .

[21]  Sang M. Lee,et al.  Impact of JIT on organizational performance of U.S. firms , 1995 .

[22]  M. Noble,et al.  Manufacturing Strategy: Testing the Cumulative Model in a Multiple Country Context* , 1995 .

[23]  Barbara B. Flynn,et al.  Relationship Between JIT and TQM: Practices and Performance , 1995 .

[24]  Pär Åhlström,et al.  Assessing changes towards lean production , 1996 .

[25]  John G. Wacker,et al.  A Theoretical Model of Manufacturing Lead Times and Their Relationship to a Manufacturing Goal Hierarchy , 1996 .

[26]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[27]  A. Hallihan,et al.  JIT manufacturing: The evolution to animplementation model founded in current practice , 1997 .

[28]  Tarun Gupta,et al.  An empirical study of just‐in‐time and total quality management principles implementation in manufacturing firms in the USA , 1997 .

[29]  Roger G. Schroeder,et al.  The impact of just-in-time manufacturing and its infrastructure on manufacturing performance , 1997 .

[30]  Xenophon Koufteros,et al.  The impact of organizational structure on the level of JIT attainment: Towards theory development , 1998 .

[31]  R. Schmenner,et al.  On theory in operations management , 1998 .

[32]  John N. Pearson,et al.  Jit Manufacturing: a Survey of Implementations in Small and Large U.S. Manufacturers , 1999 .

[33]  P. Bentler,et al.  Cutoff criteria for fit indexes in covariance structure analysis : Conventional criteria versus new alternatives , 1999 .

[34]  Ronald Siu Man Lau,et al.  A synergistic analysis of joint JIT-TQM implementation , 2000 .

[35]  R. Schroeder,et al.  Relationships between implementation of TQM, JIT, and TPM and manufacturing performance , 2001 .

[36]  R. Schroeder,et al.  The impact of total productive maintenance practices on manufacturing performance , 2001 .

[37]  Rosemary R. Fullerton,et al.  The production performance benefits from JIT implementation , 2001 .

[38]  M. Lindell,et al.  Accounting for common method variance in cross-sectional research designs. , 2001, The Journal of applied psychology.

[39]  Mahmoud M. Yasin,et al.  Organizational modifications to support JIT implementation in manufacturing and service operations , 2003 .

[40]  Mark A. Vonderembse,et al.  The impact of organizational structure on time-based manufacturing and plant performance , 2003 .

[41]  Barbara B. Flynn,et al.  An exploratory study of the nature of cumulative capabilities , 2004 .

[42]  Shaukat A. Brah,et al.  Relationship between total productive maintenance and performance , 2004 .

[43]  K. Tan,et al.  Just in time, total quality management, and supply chain management: understanding their linkages and impact on business performance , 2005 .

[44]  Andreas Größler,et al.  An empirical model of the relationships between manufacturing capabilities , 2006 .

[45]  Yoshiki Matsui,et al.  An empirical analysis of just-in-time production in Japanese manufacturing companies , 2007 .

[46]  Steve New,et al.  Celebrating the enigma: the continuing puzzle of the Toyota Production System , 2007 .

[47]  Rodolfo de Castro,et al.  Evaluation of value stream mapping in manufacturing system redesign , 2008 .

[48]  Aditya Ravi Shankar Industrial Engineering And Management , 2009 .

[49]  Aleda V. Roth,et al.  Towards a Theory of Competitive Progression: Evidence from High‐Tech Manufacturing , 2004 .

[50]  C Peter,et al.  Value Stream Management , 2011 .