Multi-Attribute Utility Model for Selection of Appropriate Procurement Method in the Construction Projects

The selection of an appropriate procurement method is becoming an increasingly important issue due to complex decision-making that has to be made by clients early in the project lifecycle. The aim at this paper is to improve and enhance procurement system in the construction industry through developing a model using the multi-attribute utility theory (MAUT) as a decision support system for the selection of appropriate procurement method for construction projects in the Gaza Strip. Factors that influence the selection of an appropriate method for construction projects in Gaza Strip were identified. The results indicated that the top significant six factors that have most influence on the selection of procurement methods in the Gaza Strip construction projects are: price competition, degree of project complexity, time constrains of project, project size, client's financial capability, and client's experience in procurement methods. The study concludes that there is no variety of procurement methods used in the Gaza Strip construction industry where a traditional procurement method is preferred. This is because most of professionals' in Gaza Strip are not familiar and not widely experienced with the other alternative procurement methods. A model was developed using Multi Atrribute Utility Theory to select the most appropriate procurement method. The multi-attribute utility -theory (MAUT) as a decision support system was able to identify the appropriate procurement method.

[1]  J. Masterman An Introduction to Building Procurement Systems , 1990 .

[2]  P. Love,et al.  Uncertainty avoidance: public sector clients and procurement selection , 2008 .

[3]  S. Thomas Ng,et al.  Parameters governing the selection of procurement system – an empirical survey , 2003 .

[4]  Y. C. Kog,et al.  Critical Success Factors for Different Project Objectives , 1999 .

[5]  Wellington Thwala,et al.  Factors influencing the selection of procurement systems in the South African construction industry , 2012 .

[6]  Sai On Cheung,et al.  Improving objectivity in procurement selection , 2001 .

[7]  Ademola Eyitope Ojo,et al.  Critical selection criteria for appropriate procurement strategy for project delivery in Nigeria , 2012 .

[8]  O. J. O. Stephen Okunlola PROMA-A Decision Support System to Determine Appropriate Procurement Method , 2012 .

[9]  John Messner,et al.  Comparing procurement methods for design-build projects , 2006 .

[10]  SANDRA PERSSON,et al.  CONSTRUCTION MANAGEMENT IN PRACTICE , 2022, Proceedings of the International Conferences on: Educational Technologies 2022 (ICEduTech 2022), Sustainability, Technology and Education 2022 (STE 2022), Internet Technologies & Society 2022 (ITS 2022) and Applied Management Advances in the 21st Cent.

[11]  Junaid M. Shaikh,et al.  Cost Benefit Analysis of Procurement Systems and the Performance of Construction Projects in East Malaysia , 2011 .

[12]  Shamil Naoum,et al.  Critical Analysis of Time and Cost of Management and Traditional Contracts , 1994 .

[13]  Lee Yong Tay,et al.  Factors Influencing The Selection Of Procurement Systems By Clients , 2006 .

[14]  A. Enshassi,et al.  Case studies in awarding the lowest bid price in construction projects , 2012 .

[15]  Swee Eng Chen,et al.  Decision Criteria and Their Subjectivity in Construction Procurement Selection , 2012 .

[16]  Keith R. Molenaar,et al.  Critical Risk Factors in Project Delivery Method Selection for Highway Projects , 2012 .

[17]  Ojo Stephen Okunlola,et al.  Developing a Decision Support System for the Selection of Appropriate Procurement Method for A Building Project In Nigeria , 2010 .