Review and perspectives on spallings release models in the 1996 performance assessment for the Waste Isolation Pilot Plant

The Waste Isolation Pilot Plant was licensed for disposal of transuranic wastes generated by the US Department of Energy. The facility consists of a repository mined in a bedded salt formation, approximately 650 m below the surface. Regulations promulgated by the US Environmental Protection Agency require that performance assessment calculations for the repository include the possibility that an exploratory drilling operation could penetrate the waste disposal areas at some time in the future. Release of contaminated solids could reach the surface during a drilling intrusion. One of the mechanisms for release, known as spallings, can occur if gas pressures in the repository exceed the hydrostatic pressure of a column of drilling mud. Calculation of solids releases for spallings depends critically on the conceptual models for the waste, for the spallings process, and assumptions regarding driller parameters and practices. The paper presents a review of the evolution of these models during regulatory review of the Compliance Certification Application for the repository. A summary and perspectives on the implementation of conservative assumptions in model development are also provided.

[1]  Jon C. Helton,et al.  Representation of two-phase flow in the vicinity of the repository in the 1996 performance assessment for the Waste Isolation Pilot Plant , 2000, Reliab. Eng. Syst. Saf..

[2]  K. L. DeVries,et al.  Analyses of backfilled transuranic wastes disposal rooms , 1991 .

[3]  B. Hughes,et al.  Transient gas flow around boreholes , 1993 .

[4]  Jon C. Helton,et al.  Direct releases to the surface and associated complementary cumulative distribution functions in the 1996 performance assessment for the Waste Isolation Pilot Plant: direct brine release , 2000, Reliab. Eng. Syst. Saf..

[5]  Arokiasamy J. Francis,et al.  Microbial gas generation under expected Waste Isolation Pilot Plant repository conditions , 1997 .

[6]  R. E. Westerman,et al.  Hydrogen generation by metal corrosion in simulated Waste Isolation Pilot Plant environments. Final report , 1997 .

[7]  Nobuo Morita,et al.  Typical Sand Production Problems Case Studies and Strategies for Sand Control , 1991 .

[8]  Kurt W. Larson,et al.  Development of the conceptual models for chemical conditions and hydrology used in the 1996 performance assessment for the Waste Isolation Pilot Plant , 2000, Reliab. Eng. Syst. Saf..

[9]  Jon C. Helton,et al.  Radionuclide transport in the vicinity of the repository and associated complementary cumulative distribution functions in the 1996 performance assessment for the Waste Isolation Pilot Plant , 2000, Reliab. Eng. Syst. Saf..

[10]  Jon C. Helton,et al.  Characterization of subjective uncertainty in the 1996 performance assessment for the Waste Isolation Pilot Plant , 2000, Reliab. Eng. Syst. Saf..

[11]  D. I. Hulbert,et al.  Waste Isolation Pilot Plant , 1980 .

[12]  Jon C. Helton,et al.  Uncertainty and sensitivity analysis for two-phase flow in the vicinity of the repository in the 1996 performance assessment for the Waste Isolation Pilot Plant: undisturbed conditions , 2000, Reliab. Eng. Syst. Saf..

[13]  T. W. Thompson,et al.  Description and evaluation of a mechanistically based conceptual model for spall , 1997 .

[14]  Jon C. Helton,et al.  Characterization of stochastic uncertainty in the 1996 performance assessment for the Waste Isolation Pilot Plant , 2000, Reliab. Eng. Syst. Saf..

[15]  D. R. Davies,et al.  Sand Production Prediction Review: Developing an Integrated Approach , 1991 .