Communication service model for wide area protection system based on IEC 61850
暂无分享,去创建一个
[1] B. Shephard,et al. Standardised communications in substations , 2001 .
[2] Feng Bo-Qin,et al. Research on Routing Algorithm and Self-Configuration in Content-Based Publish-Subscribe System , 2005 .
[3] Zeng Xiangjun,et al. Distribute Coordinated Wide Area Current Differential Protection Based on IEC61850 , 2006, TENCON 2006 - 2006 IEEE Region 10 Conference.
[4] A.P. Apostolov. IEC 61850 distributed analog values applications in substation automation systems , 2005, IEEE Power Engineering Society General Meeting, 2005.
[5] Xu Li-zi. REQUIREMENT OF IEC 61850 TO PERFORMANCE OF MESSAGES FOR SUBSTATION AUTOMATION SYSTEM , 2002 .
[6] A. Kalam,et al. The Real-Time Publisher/Subscriber Communication Model for Distributed Substation Systems , 2007, IEEE Transactions on Power Delivery.
[7] Hong-Hee Lee,et al. A study on IEC 61850 based communication for intelligent electronic devices , 2005, Proceedings. The 9th Russian-Korean International Symposium on Science and Technology, 2005. KORUS 2005..
[8] T.S. Sidhu,et al. Modelling and Simulation for Performance Evaluation of IEC61850-Based Substation Communication Systems , 2007, IEEE Transactions on Power Delivery.
[9] A. Apostolov,et al. Impact of IEC 61850 on Power System Protection , 2006, 2006 IEEE PES Power Systems Conference and Exposition.
[10] Byung-Seok Park,et al. Communication Networks for Interoperability and Reliable Service in Substation Automation System , 2007, 5th ACIS International Conference on Software Engineering Research, Management & Applications (SERA 2007).
[11] I. De Mesmaeker,et al. Protection and Substation Automation Systems: Standardization, Integration and Information Technology , 2007, 2007 IEEE Power Engineering Society Conference and Exposition in Africa - PowerAfrica.
[12] A. Apostolov. Object Models of Protection Devices in IEC 61850 , 2006, 2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition.