BLOCKCHAIN OF OPTIMAL MULTIPLE CONSTRUCTION PROJECTS PLANNING UNDER PROBABILISTIC ARRIVAL AND STOCHASTIC DURATIONS

With the rapid development of projects, firms are facing challenges in planning and controlling complex multiple construction projects. This research, therefore, aims at developing blockchain of optimal scheduling and sequencing of multiple construction projects under probabilistic arrival and stochastic durations. Each project task was considered as a block. Then, a framework for electronic project recording (EPR) system was developed. The EPRs are records for project tasks that make information available directly and securely to authorized users. In this framework, two optimization models were developed for scheduling and sequencing project blocks. The scheduling model aims to assign project tasks to available resources at minimal total cost and maximal the number of assigned project tasks. On the other hand, the sequencing model seeks to determine the start time of block execution while minimizing delay costs and minimizing the sum of task’s start times. The project arrival date and the task’s execution duration were assumed probabilistic and stochastic (normally distributed), respectively. The developed EPR system was implemented on a real case study of five projects with total of 121 tasks. Further, the system was developed when the task’s execution duration follows the Program Evaluation and Review Technique (PERT) model with four replications. The project costs (idle time and overtime costs) at optimal plan were then compared between the task’s execution duration normally distributed and PERT modelled. The results revealed negligible differences between project costs and slight changes in the sequence of project activities. Consequently, both distributions can be used interchangeably to model the task’s execution duration. Furthermore, the project costs were also compared between four solution replications and were found very close, which indicates the robustness of model solutions to random generation of task’s execution duration at both models. In conclusion, the developed EPR framework including the optimization models provided an effective planning and monitoring of construction projects that can be used to make decisions through project progress and efficient sharing of project resources at minimal idle and overtime costs. Future research considers developing a Blockchain of optimal maintenance planning.

[1]  Tifan Xiong,et al.  Multi-Objective multi-skill resource-constrained project scheduling problem with skill switches: Model and evolutionary approaches , 2021, Comput. Ind. Eng..

[2]  M. Khalilzadeh,et al.  A Multi-objective Dynamic Optimization Approach to Project Schedule Management: A Case Study of a Gas Field Construction , 2021, KSCE Journal of Civil Engineering.

[3]  Timothy O. Olawumi,et al.  Automating the modular construction process: A review of digital technologies and future directions with blockchain technology , 2021, Journal of Building Engineering.

[4]  Neda Masoud,et al.  Integrated digital twin and blockchain framework to support accountable information sharing in construction projects , 2021, Automation in Construction.

[5]  José Teixeira,et al.  RELATIONAL CONTRACTING AND ITS COMBINATION WITH THE BIM METHODOLOGY IN MITIGATING ASYMMETRIC INFORMATION PROBLEMS IN CONSTRUCTION PROJECTS , 2021 .

[6]  F. Al-turjman,et al.  A conceptual framework for blockchain smart contract adoption to manage real estate deals in smart cities , 2021, Neural Computing and Applications.

[7]  Rainer Lasch,et al.  Blockchain in operations management and manufacturing: Potential and barriers , 2020, Comput. Ind. Eng..

[8]  Richard Evans,et al.  Blockchain-based electronic healthcare record system for healthcare 4.0 applications , 2020, J. Inf. Secur. Appl..

[9]  Guoqing Zhao,et al.  Blockchain technology in agri-food value chain management: A synthesis of applications, challenges and future research directions , 2019, Comput. Ind..

[10]  Jay Lee,et al.  A blockchain enabled Cyber-Physical System architecture for Industry 4.0 manufacturing systems , 2019, Manufacturing Letters.

[11]  Natsuki Kawaguchi,et al.  Application of Blockchain to Supply Chain: Flexible Blockchain Technology , 2019, CENTERIS/ProjMAN/HCist.

[12]  Ayoub Bahnasse,et al.  Smart logistics: Study of the application of blockchain technology , 2019, EUSPN/ICTH.

[13]  A. K. Sangaiah,et al.  Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms , 2019, Computing.

[14]  Fayez F. Boctor,et al.  An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case , 2018, Eur. J. Oper. Res..

[15]  Nestor Raul Ortiz Pimiento,et al.  The project scheduling problem with non-deterministic activities duration: A literature review , 2018 .

[16]  Ahad Ali,et al.  An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources , 2017, Ann. Oper. Res..

[17]  Nengmin Wang,et al.  Metaheuristics for multi-mode cash flow balanced project scheduling with stochastic duration of activities , 2017 .

[18]  Ye Guo,et al.  Blockchain application and outlook in the banking industry , 2016, Financial Innovation.

[19]  Francisco Saldanha-da-Gama,et al.  Priority-based heuristics for the multi-skill resource constrained project scheduling problem , 2016, Expert Syst. Appl..

[20]  S. Creemers Minimizing the expected makespan of a project with stochastic activity durations under resource constraints , 2015, Journal of Scheduling.

[21]  Zbigniew Michalewicz,et al.  Multiobjective Resource-Constrained Project Scheduling with a Time-Varying Number of Tasks , 2014, TheScientificWorldJournal.

[22]  Erik Demeulemeester,et al.  Proactive policies for the stochastic resource-constrained project scheduling problem , 2011, Eur. J. Oper. Res..

[23]  Roel Leus,et al.  Resource‐Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations , 2007 .