Lot streaming models with a limited number of capacitated transporters in multistage batch production systems
暂无分享,去创建一个
[1] Jiang Chen,et al. Lot streaming with attached setups in three-machine flow shops , 1997 .
[2] Dean H. Kropp,et al. Optimal and Heuristic Models for Lot Splitting in a Flow Shop , 1990 .
[3] Kenneth R. Baker,et al. A comparative study of lot streaming procedures , 1993 .
[4] R. G. Vickson,et al. Two- and three-machine flow shop scheduling problems with equal sized transfer batches , 1992 .
[5] Chris N. Potts,et al. Structural Properties of Lot Streaming in a Flow Shop , 1998, Math. Oper. Res..
[6] Boaz Ronen,et al. Synchronized manufacturing as in OPT: from practice to theory , 1990 .
[7] R. Vickson. Optimal lot streaming for multiple products in a two-machine flow shop , 1995 .
[8] Stephen C. Graves,et al. Overlapping operations in material requirements planning , 1986 .
[9] David F. Pyke,et al. Solution Procedures for the Lot‐Streaming Problem , 1990 .
[10] Kenneth R. Baker,et al. Basic Techniques for Lot Streaming , 1993, Oper. Res..
[11] A. Z. Szendrovits. Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model , 1975 .
[12] Jiang Chen,et al. Lot streaming with attached setups in three-machine flow shops , 1998 .
[13] S. Goyal. Economic batch quantity in a multi-stage production system , 1978 .
[14] S. Reiter. A System for Managing Job-Shop Production , 1966 .
[15] Ranga V. Ramasesh,et al. Lot streaming in multistage production systems , 2000 .
[16] Subhash C. Sarin,et al. Optimal Solutions for the Single Batch, Flow Shop, Lot-streaming Problem with Equal Sublots , 2001, Decis. Sci..
[17] William G. Truscott. Production scheduling with capacity-constrained transportation activities , 1986 .
[18] Ferda Can Çetinkaya,et al. Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated , 1994 .