A Chance Constrained Programming

[1]  Ali Azadeh,et al.  An integrated DEA PCA numerical taxonomy approach for energy efficiency assessment and consumption optimization in energy intensive manufacturing sectors , 2007 .

[2]  Jayant Rajgopal,et al.  Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study , 2007 .

[3]  Allard Droste Lean thinking, banish waste and create wealth in your corporation , 2007 .

[4]  Ali Azadeh,et al.  An integrated framework for continuous assessment and improvement of manufacturing systems , 2007, Appl. Math. Comput..

[5]  Tomás Bonavía,et al.  An empirical study of lean production in the ceramic tile industry in Spain , 2006 .

[6]  Steven Nahmias,et al.  Production and operations analysis -4/E , 2005 .

[7]  P. Bruun,et al.  Lean production and the Internet , 2004 .

[8]  M. Bruce,et al.  Lean or agile: A solution for supply chain management in the textiles and clothing industry? , 2004 .

[9]  J. Winch,et al.  Supply Chain Management: Strategy, Planning, and Operation , 2003 .

[10]  Peter T. Ward,et al.  Lean manufacturing: context, practice bundles, and performance , 2003 .

[11]  Zongben Xu,et al.  Three improved neural network models for air quality forecasting , 2003 .

[12]  Paul Forrester,et al.  A model for evaluating the degree of leanness of manufacturing firms , 2002 .

[13]  Frank Rossi,et al.  Analysis of the beverage data using cluster analysis, rotated principal components analysis and LOESS curves , 2001 .

[14]  Kuldeep Kumar,et al.  Detection of financial distress via multivariate statistical analysis , 2001 .

[15]  T. Du,et al.  Using principal component analysis in process performance for multivariate data , 2000 .

[16]  Danny Berry,et al.  Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain , 1999 .

[17]  Roberto Panizzolo,et al.  Applying the lessons learned from 27 lean manufacturers.: The relevance of relationships management , 1998 .

[18]  Robert E. Spekman,et al.  An empirical investigation into supply chain management: a perspective on partnerships , 1998 .

[19]  T.C.E. Cheng,et al.  Identifying potential barriers to total quality management using principal component analysis and correspondence analysis , 1997 .

[20]  Christer Karlsson,et al.  Change Processes Towards Lean Production: The Role of the Management Accounting System , 1996 .

[21]  Richard Lamming,et al.  Squaring lean supply with supply chain management , 1996 .

[22]  Karel Williams,et al.  Management Practice or Structural Factors: The Case of America Versus Japan in the Car Industry , 1995 .

[23]  John Paul Macduffie Human Resource Bundles and Manufacturing Performance: Organizational Logic and Flexible Production Systems in the World Auto Industry , 1995 .

[24]  A. Sohal,et al.  Lean Production: Experience among Australian Organizations , 1994 .

[25]  John R. Current,et al.  Application of facility location modeling constructs to vendor selection problems , 1994 .

[26]  Yasuhiro Monden,et al.  Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .

[27]  Herbert J. Grünwald,et al.  Many steps towards zero inventory , 1992 .

[28]  R. Hill,et al.  Using the Analytic Hierarchy Process to Structure the Supplier Selection Procedure , 1992 .

[29]  G. Stevens Integrating the Supply Chain , 1989 .

[30]  Boaz Ronen,et al.  A Decision Support System for Purchasing Management of Large Projects: Special Focus Article , 1988, Oper. Res..

[31]  R. M. Monczka,et al.  Perceived Importance of Supplier Information , 1981 .

[32]  Todd A. Boyle,et al.  Lean, take two! Reflections from the second attempt at lean implementation , 2009 .

[33]  Bengt Klefsjö,et al.  The machine that changed the world , 2008 .

[34]  A. Rangone,et al.  A contingent approach to the design of vendor selection systems for different types of co‐operative customer/supplier relationships , 2000 .

[35]  Gülay Barbarosoğlu,et al.  An Application of the Analytic Hierarchy Process to the Supplier Selection Problem , 1997 .

[36]  Alberto Grando,et al.  Supply management: a vendor rating assessment , 1995 .

[37]  G. Pisano,et al.  Beyond World-Class : The New Manufacturing Strategy , 1994 .

[38]  大野 耐一,et al.  Toyota production system : beyond large-scale production , 1988 .

[39]  Y. Sugimori,et al.  Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .