A Chance Constrained Programming
暂无分享,去创建一个
[1] Ali Azadeh,et al. An integrated DEA PCA numerical taxonomy approach for energy efficiency assessment and consumption optimization in energy intensive manufacturing sectors , 2007 .
[2] Jayant Rajgopal,et al. Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study , 2007 .
[3] Allard Droste. Lean thinking, banish waste and create wealth in your corporation , 2007 .
[4] Ali Azadeh,et al. An integrated framework for continuous assessment and improvement of manufacturing systems , 2007, Appl. Math. Comput..
[5] Tomás Bonavía,et al. An empirical study of lean production in the ceramic tile industry in Spain , 2006 .
[6] Steven Nahmias,et al. Production and operations analysis -4/E , 2005 .
[7] P. Bruun,et al. Lean production and the Internet , 2004 .
[8] M. Bruce,et al. Lean or agile: A solution for supply chain management in the textiles and clothing industry? , 2004 .
[9] J. Winch,et al. Supply Chain Management: Strategy, Planning, and Operation , 2003 .
[10] Peter T. Ward,et al. Lean manufacturing: context, practice bundles, and performance , 2003 .
[11] Zongben Xu,et al. Three improved neural network models for air quality forecasting , 2003 .
[12] Paul Forrester,et al. A model for evaluating the degree of leanness of manufacturing firms , 2002 .
[13] Frank Rossi,et al. Analysis of the beverage data using cluster analysis, rotated principal components analysis and LOESS curves , 2001 .
[14] Kuldeep Kumar,et al. Detection of financial distress via multivariate statistical analysis , 2001 .
[15] T. Du,et al. Using principal component analysis in process performance for multivariate data , 2000 .
[16] Danny Berry,et al. Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain , 1999 .
[17] Roberto Panizzolo,et al. Applying the lessons learned from 27 lean manufacturers.: The relevance of relationships management , 1998 .
[18] Robert E. Spekman,et al. An empirical investigation into supply chain management: a perspective on partnerships , 1998 .
[19] T.C.E. Cheng,et al. Identifying potential barriers to total quality management using principal component analysis and correspondence analysis , 1997 .
[20] Christer Karlsson,et al. Change Processes Towards Lean Production: The Role of the Management Accounting System , 1996 .
[21] Richard Lamming,et al. Squaring lean supply with supply chain management , 1996 .
[22] Karel Williams,et al. Management Practice or Structural Factors: The Case of America Versus Japan in the Car Industry , 1995 .
[23] John Paul Macduffie. Human Resource Bundles and Manufacturing Performance: Organizational Logic and Flexible Production Systems in the World Auto Industry , 1995 .
[24] A. Sohal,et al. Lean Production: Experience among Australian Organizations , 1994 .
[25] John R. Current,et al. Application of facility location modeling constructs to vendor selection problems , 1994 .
[26] Yasuhiro Monden,et al. Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .
[27] Herbert J. Grünwald,et al. Many steps towards zero inventory , 1992 .
[28] R. Hill,et al. Using the Analytic Hierarchy Process to Structure the Supplier Selection Procedure , 1992 .
[29] G. Stevens. Integrating the Supply Chain , 1989 .
[30] Boaz Ronen,et al. A Decision Support System for Purchasing Management of Large Projects: Special Focus Article , 1988, Oper. Res..
[31] R. M. Monczka,et al. Perceived Importance of Supplier Information , 1981 .
[32] Todd A. Boyle,et al. Lean, take two! Reflections from the second attempt at lean implementation , 2009 .
[33] Bengt Klefsjö,et al. The machine that changed the world , 2008 .
[34] A. Rangone,et al. A contingent approach to the design of vendor selection systems for different types of co‐operative customer/supplier relationships , 2000 .
[35] Gülay Barbarosoğlu,et al. An Application of the Analytic Hierarchy Process to the Supplier Selection Problem , 1997 .
[36] Alberto Grando,et al. Supply management: a vendor rating assessment , 1995 .
[37] G. Pisano,et al. Beyond World-Class : The New Manufacturing Strategy , 1994 .
[38] 大野 耐一,et al. Toyota production system : beyond large-scale production , 1988 .
[39] Y. Sugimori,et al. Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .